Circuito DPED105CAN
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jun26 | May26 | Abr26 |
|---|---|---|---|
| Clasificación | D | D | D |
| Clientes | 5339 | 5338 | 5338 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 |
| % Servicio | 97.53% | 98.09% | 99.10% |
| % Sin Servicio | 2.47% | 1.91% | 0.90% |
| Interrupción Programada (Hrs) | 1.00 | 8.00 | 5.00 |
| Interrupción Ejecutada (Hrs) | 17.81 | 13.73 | 6.49 |
| Promedio Interrupción Diarias (Hrs) | 0.59 | 0.45 | 0.21 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 08/07/2026 | Ejecutada | 13:28:53 | 13:40:14 | 0.19 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 07/07/2026 | Ejecutada | 11:00:41 | 11:04:04 | 0.06 | DISPARO DESCONOCIDO |
| 04/07/2026 | Programada | 12:00:00 | 16:00:00 | 4 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // OTROS |
| 04/07/2026 | Ejecutada | 16:47:42 | 17:03:40 | 8.78 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // OTROS |
| 04/07/2026 | Ejecutada | 12:00:00 | 15:46:40 | 8.78 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // OTROS |
| 04/07/2026 | Ejecutada | 07:15:50 | 12:00:00 | 8.78 | FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // OTROS |
| 02/07/2026 | Ejecutada | 16:23:18 | 16:35:35 | 0.4 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 02/07/2026 | Ejecutada | 15:24:19 | 15:35:55 | 0.4 | DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 01/07/2026 | Ejecutada | 16:16:11 | 16:21:50 | 0.09 | DISPARO DESCONOCIDO |