Circuito DPED105CAN
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 |
|---|---|---|---|---|
| Clasificación | D | D | D | D |
| Clientes | 5339 | 5339 | 5338 | 5338 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 |
| % Servicio | 96.32% | 97.53% | 98.09% | 99.10% |
| % Sin Servicio | 3.68% | 2.47% | 1.91% | 0.90% |
| Interrupción Programada (Hrs) | 21.00 | 1.00 | 8.00 | 5.00 |
| Interrupción Ejecutada (Hrs) | 26.48 | 17.81 | 13.73 | 6.49 |
| Promedio Interrupción Diarias (Hrs) | 0.87 | 0.59 | 0.45 | 0.21 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 18/08/2026 | Programada | 13:00:00 | 18:00:00 | 5 | DISPARO DESCONOCIDO |
| 18/08/2026 | Ejecutada | 12:02:30 | 12:16:40 | 0.24 | DISPARO DESCONOCIDO |
| 14/08/2026 | Ejecutada | 16:32:31 | 16:36:33 | 0.07 | DISPARO DESCONOCIDO |
| 13/08/2026 | Ejecutada | 19:26:47 | 19:31:09 | 2.04 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION |
| 13/08/2026 | Ejecutada | 15:13:49 | 17:06:27 | 2.04 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION |
| 13/08/2026 | Ejecutada | 12:00:37 | 12:05:49 | 2.04 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION |
| 12/08/2026 | Ejecutada | 10:39:14 | 10:42:29 | 0.05 | INTERCONEXION DE PROYECTOS |
| 11/08/2026 | Ejecutada | 15:39:38 | 15:42:57 | 0.06 | DISPARO DESCONOCIDO |