Buscar Circuitos Glosario

Circuito DPED105BAS

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 861 861 842 842 836 841 825 800 788 790 790 789
% Nivel Cobranza 0.00% 89.99% 93.97% 85.47% 94.84% 81.44% 115.30% 88.38% 99.99% 109.83% 94.51% 101.85%
% Nivel Pérdida 0.00% -16.37% -20.14% -14.58% -52.23% -29.44% -19.60% -48.84% -33.11% -26.09% -28.23% 26.69%
Energía Suministrada (GWh) 0 0.14 0.14 0.13 0.09 0.1 0.09 0.08 0.09 0.1 0.1 0.19
Energía Facturada (GWh) 0 0.17 0.16 0.15 0.13 0.13 0.11 0.12 0.12 0.12 0.13 0.14
Energía Cobrada (GWh) 0 0.15 0.15 0.13 0.12 0.11 0.13 0.11 0.12 0.14 0.12 0.14
% Servicio 97.27% 98.10% 94.52% 97.24% 97.55% 99.17% 98.29% 95.58% 96.62% 99.88% 95.74% 96.42%
% Sin Servicio 2.73% 1.90% 5.48% 2.76% 2.45% 0.83% 1.71% 4.42% 3.38% 0.12% 4.26% 3.58%
Interrupción Programada (Hrs) 7.00 16.00 25.00 5.00 12.00 4.00 1.00 7.00 10.00 9.00 19.00 5.00
Interrupción Ejecutada (Hrs) 19.67 13.68 39.46 19.87 17.67 6.00 12.28 31.83 24.31 0.87 31.09 26.12
Promedio Interrupción Diarias (Hrs) 0.65 0.45 1.30 0.65 0.58 0.20 0.40 1.05 0.80 0.03 1.02 0.86
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DPED105BAS
Interrupciones Programadas 7
Interrupciones Ejecutadas 23.31
% Ejecución Operativa 333.00%
Detalle de Salidas - Circuito DPED105BAS
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Programada 09:00:00 16:00:00 7 LÍNEAS LIGADAS REDES // PERDIDA DE TENSION DE LA 12.5
22/10/2026 Ejecutada 21:03:55 21:07:30 0.67 LÍNEAS LIGADAS REDES // PERDIDA DE TENSION DE LA 12.5
22/10/2026 Ejecutada 20:27:10 21:03:55 0.67 LÍNEAS LIGADAS REDES // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 21:57:16 22:03:45 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 19:29:46 20:38:15 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 19:19:46 19:25:13 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 18:59:52 19:17:50 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 18:43:30 18:59:17 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 18:31:55 18:43:23 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 18:17:50 18:31:41 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
20/10/2026 Ejecutada 17:59:50 18:17:50 2.62 CORRECTIVO EN CONDUCTOR DE FASE // DISPARO DESCONOCIDO
19/10/2026 Ejecutada 11:31:09 11:34:44 0.06 DISPARO DESCONOCIDO
17/10/2026 Ejecutada 18:50:08 19:10:38 0.34 CORRECTIVO EN FUSIBLE
16/10/2026 Ejecutada 21:55:41 21:59:54 0.07 PUENTE ROTO
15/10/2026 Ejecutada 19:17:20 19:20:42 0.18 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5 // PUENTE ROTO
15/10/2026 Ejecutada 19:12:12 19:15:56 0.18 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5 // PUENTE ROTO
15/10/2026 Ejecutada 01:26:29 01:30:19 0.18 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5 // PUENTE ROTO
Basurero, Guazumal (Parcial).