Circuito DPED105BAS

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación D D D D D D D D D D D D
Clientes 842 842 836 841 825 800 788 790 790 789 789 792
% Nivel Cobranza 0.00% 85.47% 94.84% 81.44% 115.30% 88.38% 99.99% 109.83% 94.51% 101.85% 95.51% 88.70%
% Nivel Pérdida 0.00% -14.58% -52.23% -29.44% -19.60% -48.84% -33.11% -26.09% -28.23% 26.69% 20.41% 35.49%
Energía Suministrada (GWh) 0 0.13 0.09 0.1 0.09 0.08 0.09 0.1 0.1 0.19 0.19 0.22
Energía Facturada (GWh) 0 0.15 0.13 0.13 0.11 0.12 0.12 0.12 0.13 0.14 0.15 0.14
Energía Cobrada (GWh) 0 0.13 0.12 0.11 0.13 0.11 0.12 0.14 0.12 0.14 0.15 0.12
% Servicio 94.52% 97.24% 97.55% 99.17% 98.29% 95.58% 96.62% 99.88% 95.74% 96.42% 95.26% 96.59%
% Sin Servicio 5.48% 2.76% 2.45% 0.83% 1.71% 4.42% 3.38% 0.12% 4.26% 3.58% 4.74% 3.41%
Interrupción Programada (Hrs) 25.00 5.00 12.00 4.00 1.00 7.00 10.00 9.00 19.00 5.00 6.00 0.00
Interrupción Ejecutada (Hrs) 39.46 19.87 17.67 6.00 12.28 31.83 24.31 0.87 31.09 26.12 34.58 24.88
Promedio Interrupción Diarias (Hrs) 1.30 0.65 0.58 0.20 0.40 1.05 0.80 0.03 1.02 0.86 1.14 0.82
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DPED105BAS
Interrupciones Programadas 5
Interrupciones Ejecutadas 26.69
% Ejecución Operativa 533.80%
Detalle de Salidas - Circuito DPED105BAS
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
18/08/2026 Programada 13:00:00 18:00:00 5
13/08/2026 Ejecutada 19:26:44 19:32:52 2.06 DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES
13/08/2026 Ejecutada 17:08:03 17:11:48 2.06 DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES
13/08/2026 Ejecutada 15:18:05 17:06:39 2.06 DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES
13/08/2026 Ejecutada 12:00:37 12:05:49 2.06 DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES
12/08/2026 Ejecutada 10:44:01 10:47:34 3.69 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // PERDIDA DE TENSION DE LA 12.5
12/08/2026 Ejecutada 10:39:14 10:42:29 3.69 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // PERDIDA DE TENSION DE LA 12.5
12/08/2026 Ejecutada 08:53:01 09:09:19 3.69 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // PERDIDA DE TENSION DE LA 12.5
12/08/2026 Ejecutada 05:41:27 08:52:58 3.69 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // PERDIDA DE TENSION DE LA 12.5
12/08/2026 Ejecutada 05:32:30 05:39:19 3.69 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // PERDIDA DE TENSION DE LA 12.5
Basurero, Guazumal (Parcial).