Circuito DESP09

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 3139 3139 3125 3107 3067 3066 3056 3065 3076 3109 3138 3138
% Nivel Cobranza 0.00% 95.53% 88.42% 93.29% 103.79% 100.48% 108.06% 103.89% 107.44% 103.71% 100.51% 90.05%
% Nivel Pérdida 0.00% 14.03% 12.79% 12.95% 14.63% 6.77% 10.00% 8.49% 6.58% 7.80% 6.00% 15.94%
Energía Suministrada (GWh) 0 1.89 1.84 1.59 1.55 1.39 1.52 1.63 1.68 1.83 1.94 2.05
Energía Facturada (GWh) 0 1.62 1.60 1.38 1.32 1.30 1.37 1.49 1.57 1.69 1.82 1.72
Energía Cobrada (GWh) 0 1.55 1.42 1.29 1.37 1.30 1.48 1.55 1.69 1.75 1.83 1.55
% Servicio 98.91% 99.61% 97.51% 99.45% 99.62% 98.41% 100.00% 99.94% 98.92% 99.21% 99.68% 99.95%
% Sin Servicio 1.09% 0.39% 2.49% 0.55% 0.38% 1.59% 0.00% 0.06% 1.08% 0.79% 0.32% 0.05%
Interrupción Programada (Hrs) 18.00 5.00 29.00 10.00 0.00 3.00 0.00 0.00 3.00 0.00 6.00 0.00
Interrupción Ejecutada (Hrs) 7.83 2.82 17.93 3.93 2.77 11.47 0.00 0.45 7.92 5.75 2.32 0.40
Promedio Interrupción Diarias (Hrs) 0.26 0.09 0.59 0.13 0.09 0.38 0.00 0.01 0.26 0.19 0.08 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP09
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.12
% Ejecución Operativa 0%
Detalle de Salidas - Circuito DESP09
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/08/2026 Ejecutada 17:12:00 17:19:00 0.12 DISTRIBUCION (DISPARO/AVERIAS) - FALLOS EN TRANSFORMADOR
CIUDAD COLONIAL, CIUDAD NUEVA, SAN CARLOS, SAN LAZARO, SAN MIGUEL, VILLA FRANCISCA.