Circuito DESP06

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 809 803 807 807 812 809 812 808 810 806 811 805
% Nivel Cobranza 96.89% 98.63% 95.71% 103.38% 90.36% 96.58% 100.02% 100.51% 110.11% 104.84% 105.72% 104.26%
% Nivel Pérdida 10.32% 17.34% 16.55% 15.38% 14.38% 14.64% 15.71% 9.02% 12.26% 12.31% 11.60% 8.67%
Energía Suministrada (GWh) 1.21 1.26 1.23 1.18 1.15 1.02 0.99 0.88 0.98 1.04 1.06 1.13
Energía Facturada (GWh) 1.08 1.04 1.03 1.00 0.98 0.87 0.84 0.80 0.86 0.91 0.94 1.04
Energía Cobrada (GWh) 1.05 1.03 0.98 1.03 0.89 0.84 0.84 0.81 0.95 0.96 1.00 1.08
% Servicio 99.58% 99.95% 98.84% 99.73% 98.27% 99.85% 99.04% 98.21% 100.00% 99.96% 99.04% 99.18%
% Sin Servicio 0.42% 0.05% 1.16% 0.27% 1.73% 0.15% 0.96% 1.79% 0.00% 0.04% 0.96% 0.82%
Interrupción Programada (Hrs) 10.00 5.00 0.00 0.00 29.00 0.00 4.00 0.00 0.00 6.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.03 0.33 8.33 1.92 12.48 1.10 6.92 12.87 0.00 0.28 6.98 5.97
Promedio Interrupción Diarias (Hrs) 0.10 0.01 0.27 0.06 0.41 0.04 0.23 0.42 0.00 0.01 0.23 0.20
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP06
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.12
% Ejecución Operativa 0%
Detalle de Salidas - Circuito DESP06
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Ejecutada 10:03:00 10:13:00 0.17 DISTRIBUCION (OBRAS) - CONSTRUCCION LINEA MT
19/10/2026 Ejecutada 21:36:00 23:33:00 1.95 DISTRIBUCION (FACILIDADES OPERATIVAS) - PARA FACILITAR TRABAJOS A OTRO CTO
CIUDAD COLONIAL, SAN ANTON, SAN LAZARO, SAN MIGUEL, VILLA FRANCISCA.