Circuito DESP06
Distribuidora EdeEste - Provincia Distrito Nacional
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
Clientes | 813 | 799 | 795 | 799 | 801 | 806 | 826 | 837 | 830 | 805 | 810 | 804 |
% Nivel Cobranza | 49.73% | 100.06% | 108.55% | 117.48% | 100.17% | 109.46% | 87.58% | 101.40% | 98.43% | 95.99% | 96.06% | 101.93% |
% Nivel Pérdida | -23.50% | 27.33% | 33.59% | 33.58% | 25.68% | 34.06% | 32.67% | 32.97% | 30.30% | 28.51% | 28.67% | 24.55% |
Energía Suministrada (GWh) | 1.07 | 0.89 | 0.99 | 1.04 | 1.01 | 1.24 | 1.20 | 1.24 | 1.15 | 1.13 | 1.06 | 0.94 |
Energía Facturada (GWh) | 1.32 | 0.65 | 0.66 | 0.69 | 0.75 | 0.82 | 0.80 | 0.83 | 0.8 | 0.81 | 0.76 | 0.71 |
Energía Cobrada (GWh) | 0.66 | 0.65 | 0.72 | 0.81 | 0.75 | 0.89 | 0.70 | 0.84 | 0.79 | 0.77 | 0.73 | 0.73 |
% Servicio | 99.71% | 99.64% | 100.00% | 100.00% | 99.11% | 99.72% | 99.18% | 98.38% | 99.70% | 99.82% | 99.90% | 99.91% |
% Sin Servicio | 0.29% | 0.36% | 0.00% | 0.00% | 0.89% | 0.28% | 0.82% | 1.62% | 0.30% | 0.18% | 0.10% | 0.09% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 6.00 | 2.00 | 13.00 | 29.00 | 30.00 | 6.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 2.12 | 2.62 | 0.00 | 0.00 | 6.52 | 2.05 | 6.02 | 11.85 | 2.22 | 1.33 | 0.73 | 0.68 |
Promedio Interrupción Diarias (Hrs) | 0.07 | 0.09 | 0.00 | 0.00 | 0.21 | 0.07 | 0.20 | 0.39 | 0.07 | 0.04 | 0.02 | 0.02 |
CIUDAD COLONIAL (Calles/Avenidas: 19 De Marzo, Arz. Meriño, Arzobispo Nouel, Duarte, El Conde, Espaillat, Gral. Luperon, Hostos, Jose Reyes, Las Mercedes, Padre Billini, Pedro Valverde, Salome Ureña, Sanchez)
SAN LAZARO (Calles/Avenidas: Juan Isidro Perez, Santiago Rodriguez)
SAN MIGUEL (Calles/Avenidas: Juan Isidro Perez)
SAN LAZARO (Calles/Avenidas: Juan Isidro Perez, Santiago Rodriguez)
SAN MIGUEL (Calles/Avenidas: Juan Isidro Perez)