Buscar Circuitos Glosario

Circuito DESP06

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 807 807 812 809 812 808 810 806 811 805 811 805
% Nivel Cobranza 0.00% 103.38% 90.36% 96.58% 100.02% 100.51% 110.11% 104.84% 105.72% 104.26% 104.78% 87.69%
% Nivel Pérdida 0.00% 15.38% 14.38% 14.64% 15.71% 9.02% 12.26% 12.31% 11.60% 8.67% 12.46% 18.75%
Energía Suministrada (GWh) 0 1.18 1.15 1.02 0.99 0.88 0.98 1.04 1.06 1.13 1.23 1.28
Energía Facturada (GWh) 0 1.00 0.98 0.87 0.84 0.80 0.86 0.91 0.94 1.04 1.07 1.04
Energía Cobrada (GWh) 0 1.03 0.89 0.84 0.84 0.81 0.95 0.96 1.00 1.08 1.12 0.91
% Servicio 98.84% 99.73% 98.27% 99.85% 99.04% 98.21% 100.00% 99.96% 99.04% 99.18% 99.97% 99.86%
% Sin Servicio 1.16% 0.27% 1.73% 0.15% 0.96% 1.79% 0.00% 0.04% 0.96% 0.82% 0.03% 0.14%
Interrupción Programada (Hrs) 0.00 0.00 29.00 0.00 4.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.33 1.92 12.48 1.10 6.92 12.87 0.00 0.28 6.98 5.97 0.23 1.02
Promedio Interrupción Diarias (Hrs) 0.27 0.06 0.41 0.04 0.23 0.42 0.00 0.01 0.23 0.20 0.01 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP06
Interrupciones Programadas 5.00
Interrupciones Ejecutadas 0.10
% Ejecución Operativa 2.00%
Detalle de Salidas - Circuito DESP06
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/08/2026 Programada 09:20:00 14:20:00 5.00 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
19/08/2026 Ejecutada 09:41:00 09:47:00 0.10 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
CIUDAD COLONIAL, SAN ANTON, SAN LAZARO, SAN MIGUEL, VILLA FRANCISCA.