Buscar Circuitos Glosario

Circuito DESP03

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1846 1846 1840 1857 4222 4211 4196 4193 4174 4142 4147 4142
% Nivel Cobranza 0.00% 90.60% 90.37% 425.91% 101.62% 97.44% 117.83% 99.83% 111.64% 106.96% 96.48% 93.78%
% Nivel Pérdida 0.00% 25.12% 28.17% 72.28% 13.92% 8.67% 13.58% 27.47% 10.75% 7.11% 9.04% 15.59%
Energía Suministrada (GWh) 0 1.60 1.52 3.41 4.34 3.88 4.21 5.92 4.66 5.15 5.55 5.84
Energía Facturada (GWh) 0 1.20 1.09 0.95 3.74 3.54 3.64 4.30 4.16 4.79 5.05 4.93
Energía Cobrada (GWh) 0 1.09 0.99 4.03 3.80 3.45 4.29 4.29 4.64 5.12 4.87 4.62
% Servicio 99.92% 99.95% 98.00% 98.03% 99.40% 98.42% 99.72% 99.87% 99.05% 99.31% 99.83% 99.86%
% Sin Servicio 0.08% 0.05% 2.00% 1.97% 0.60% 1.58% 0.28% 0.13% 0.95% 0.69% 0.17% 0.14%
Interrupción Programada (Hrs) 0.00 5.00 18.00 24.00 16.00 7.00 10.00 9.00 14.00 5.00 3.00 6.00
Interrupción Ejecutada (Hrs) 0.57 0.38 14.42 14.20 4.32 11.38 1.98 0.95 6.92 5.05 1.22 1.05
Promedio Interrupción Diarias (Hrs) 0.02 0.01 0.47 0.47 0.14 0.37 0.07 0.03 0.23 0.17 0.04 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP03
Interrupciones Programadas 0
Interrupciones Ejecutadas 7.80
% Ejecución Operativa 0%
Detalle de Salidas - Circuito DESP03
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
11/08/2026 Ejecutada 14:30:00 17:53:00 3.90 DISTRIBUCION (DISPARO/AVERIAS) - LLUVIAS // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA
11/08/2026 Ejecutada 13:36:00 14:07:00 3.90 DISTRIBUCION (DISPARO/AVERIAS) - LLUVIAS // DISTRIBUCION (DISPARO/AVERIAS) - RAMA SOBRE LINEA
CIUDAD COLONIAL, CIUDAD NUEVA, GASCUE, SAN LAZARO, SAN MIGUEL, SANTA BARBARA, VILLA FRANCISCA.