Buscar Circuitos Glosario

Circuito DESP02

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 5541 5541 5543 5674 5569 5538 5515 5541 5589 5569 5580 5562
% Nivel Cobranza 0.00% 96.79% 82.29% 95.14% 103.59% 93.89% 105.61% 96.23% 107.57% 103.53% 91.29% 93.21%
% Nivel Pérdida 0.00% 47.96% 47.22% 47.39% 44.91% 39.04% 41.32% 36.71% 46.06% 44.80% 46.57% 52.18%
Energía Suministrada (GWh) 0 5.40 5.14 4.40 4.13 3.64 3.89 3.88 4.36 4.95 5.44 5.66
Energía Facturada (GWh) 0 2.81 2.71 2.32 2.28 2.22 2.28 2.45 2.35 2.73 2.91 2.71
Energía Cobrada (GWh) 0 2.72 2.23 2.20 2.36 2.08 2.41 2.36 2.53 2.83 2.65 2.52
% Servicio 98.82% 99.25% 97.89% 99.14% 99.22% 98.11% 99.52% 98.37% 96.87% 98.20% 100.00% 100.00%
% Sin Servicio 1.18% 0.75% 2.11% 0.86% 0.78% 1.89% 0.48% 1.63% 3.13% 1.80% 0.00% 0.00%
Interrupción Programada (Hrs) 18.00 17.00 31.00 3.00 0.00 0.00 3.00 7.00 9.00 12.00 0.00 6.00
Interrupción Ejecutada (Hrs) 8.50 5.37 15.17 6.20 5.63 13.60 3.45 12.12 22.83 13.13 0.00 0.00
Promedio Interrupción Diarias (Hrs) 0.28 0.18 0.50 0.20 0.19 0.45 0.11 0.40 0.75 0.43 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP02
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.27
% Ejecución Operativa 0%
Detalle de Salidas - Circuito DESP02
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/08/2026 Ejecutada 09:52:00 09:58:00 0.10 DISTRIBUCION (DISPARO/AVERIAS) - CUT OUT ROTO/QUEDAMO/PASADO
15/08/2026 Ejecutada 18:18:00 18:28:00 0.17 DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO
CALERO, VILLA DUARTE, EL PENSADOR, ISABELITA, LA FRANCIA, LOS CARACOLES-SANS SOUCI, LOS MAMEYES, LOS MOLINOS (OZAMA), PUEBLO NUEVO, RESIDENCIAL TURISTICO SANS SOUCI, SIMONICO.