Circuito DESP01
Distribuidora EdeEste - Provincia Distrito Nacional
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 2990 | 2990 | 3008 | 2982 | 2980 | 2951 | 2956 | 2941 | 2959 | 2978 | 2963 | 3008 |
| % Nivel Cobranza | 0.00% | 118.46% | 112.30% | 111.55% | 122.99% | 117.53% | 128.23% | 120.07% | 124.19% | 125.05% | 109.11% | 97.87% |
| % Nivel Pérdida | 0.00% | 47.44% | 47.96% | 42.21% | 40.29% | 36.53% | 41.27% | 41.32% | 43.15% | 36.71% | 33.04% | 38.81% |
| Energía Suministrada (GWh) | 0 | 1.80 | 1.74 | 1.48 | 1.38 | 1.29 | 1.40 | 1.54 | 1.57 | 1.72 | 1.75 | 1.80 |
| Energía Facturada (GWh) | 0 | 0.95 | 0.90 | 0.86 | 0.82 | 0.82 | 0.82 | 0.90 | 0.89 | 1.09 | 1.17 | 1.1 |
| Energía Cobrada (GWh) | 0 | 1.12 | 1.02 | 0.95 | 1.01 | 0.96 | 1.06 | 1.08 | 1.11 | 1.36 | 1.28 | 1.08 |
| % Servicio | 99.35% | 99.36% | 98.72% | 99.78% | 99.73% | 98.96% | 99.72% | 99.29% | 98.78% | 97.75% | 99.87% | 97.99% |
| % Sin Servicio | 0.65% | 0.64% | 1.28% | 0.22% | 0.27% | 1.04% | 0.28% | 0.71% | 1.22% | 2.25% | 0.13% | 2.01% |
| Interrupción Programada (Hrs) | 6.00 | 0.00 | 18.00 | 9.00 | 3.00 | 0.00 | 0.00 | 0.00 | 12.00 | 3.00 | 3.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 4.70 | 4.63 | 9.18 | 1.58 | 1.97 | 7.48 | 2.02 | 5.32 | 8.90 | 16.43 | 0.97 | 14.67 |
| Promedio Interrupción Diarias (Hrs) | 0.15 | 0.15 | 0.30 | 0.05 | 0.06 | 0.25 | 0.07 | 0.17 | 0.29 | 0.54 | 0.03 | 0.48 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 13/08/2026 | Ejecutada | 17:28:00 | 17:32:00 | 0.17 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 13/08/2026 | Ejecutada | 08:36:00 | 08:42:00 | 0.17 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 11/08/2026 | Ejecutada | 23:00:00 | 23:14:00 | 0.23 | DISTRIBUCION (DISPARO/AVERIAS) - FALLOS EN FUSIBLE |
| 10/08/2026 | Programada | 09:20:00 | 15:20:00 | 6.00 | DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT |
| 10/08/2026 | Ejecutada | 09:59:00 | 10:10:00 | 0.18 | DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT |