Buscar Circuitos Glosario

Circuito DESP01

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 3007 3003 2990 2990 3008 2982 2980 2951 2956 2941 2959 2978
% Nivel Cobranza 93.75% 94.45% 114.87% 118.46% 112.30% 111.55% 122.99% 117.53% 128.23% 120.07% 124.19% 125.05%
% Nivel Pérdida 42.44% 45.09% 45.49% 47.44% 47.96% 42.21% 40.29% 36.53% 41.27% 41.32% 43.15% 36.71%
Energía Suministrada (GWh) 1.90 1.96 1.87 1.80 1.74 1.48 1.38 1.29 1.40 1.54 1.57 1.72
Energía Facturada (GWh) 1.10 1.08 1.02 0.95 0.90 0.86 0.82 0.82 0.82 0.90 0.89 1.09
Energía Cobrada (GWh) 1.03 1.02 1.17 1.12 1.02 0.95 1.01 0.96 1.06 1.08 1.11 1.36
% Servicio 99.35% 99.89% 99.35% 99.36% 98.72% 99.78% 99.73% 98.96% 99.72% 99.29% 98.78% 97.75%
% Sin Servicio 0.65% 0.11% 0.65% 0.64% 1.28% 0.22% 0.27% 1.04% 0.28% 0.71% 1.22% 2.25%
Interrupción Programada (Hrs) 14.00 10.00 6.00 0.00 18.00 9.00 3.00 0.00 0.00 0.00 12.00 3.00
Interrupción Ejecutada (Hrs) 4.67 0.82 4.70 4.63 9.18 1.58 1.97 7.48 2.02 5.32 8.90 16.43
Promedio Interrupción Diarias (Hrs) 0.15 0.03 0.15 0.15 0.30 0.05 0.06 0.25 0.07 0.17 0.29 0.54
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito DESP01
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.62
% Ejecución Operativa 0%
Detalle de Salidas - Circuito DESP01
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/10/2026 Ejecutada 10:06:00 10:43:00 0.62 DISTRIBUCION (DISPARO/AVERIAS) - POSTE ROTO/LADEADO/QUEMADO
BOROJOL, DON BOSCO, GASCUE, SAN CARLOS, VILLA CONSUELO, VILLA FRANCISCA.