Circuito CUMB501A

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jun24 May24 Abr24 Mar24 Feb24 Ene24 Dic23 Nov23 Oct23 Sep23 Ago23 Jul23
Clasificación D D D D D D D D A D D D
Clientes 1322 1322 1325 1324 1325 1318 1311 1280 1161 1161 1173 1173
% Nivel Cobranza 0.00% 102.44% 95.42% 84.95% 84.16% 90.16% 101.06% 84.25% 90.49% 82.34% 84.24% 86.93%
% Nivel Pérdida 0.00% 66.88% 68.64% 68.87% 67.69% 66.78% 69.06% 69.54% 70.37% 70.48% 72.90% 70.92%
Energía Suministrada (GWh) 0 0.72 0.74 0.73 0.73 0.71 0.74 0.75 0.75 0.76 0.79 0.71
Energía Facturada (GWh) 0 0.24 0.23 0.23 0.24 0.23 0.23 0.23 0.22 0.23 0.21 0.21
Energía Cobrada (GWh) 0 0.24 0.22 0.19 0.2 0.21 0.23 0.19 0.2 0.19 0.18 0.18
% Servicio 99.79% 99.82% 99.80% 99.71% 99.97% 99.66% 100.00% 99.79% 99.83% 99.54% 99.48% 99.14%
% Sin Servicio 0.21% 0.18% 0.20% 0.29% 0.03% 0.34% 0.00% 0.21% 0.17% 0.46% 0.52% 0.86%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00
Interrupción Ejecutada (Hrs) 1.53 1.33 1.49 2.10 0.23 2.50 0.00 1.51 1.22 3.37 3.76 6.30
Promedio Interrupción Diarias (Hrs) 0.05 0.04 0.05 0.07 0.01 0.08 0.00 0.05 0.04 0.11 0.12 0.21
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CUMB501A
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.16
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CUMB501A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/06/2024 Ejecutada 17:20:14 17:36:36 0.58 CORRECTIVO EN FUSIBLE // CORRECTIVO EN FUSIBLE //
14/06/2024 Ejecutada 09:19:24 09:38:03 0.58 CORRECTIVO EN FUSIBLE // CORRECTIVO EN FUSIBLE //
El Puerto, La Cumbre, Rancho La Cumbre, Bo. Puerto Rico, Batey 61, Los Ganchos, El Campito.