Circuito CUMB501
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Jun24 | May24 | Abr24 | Mar24 | Feb24 | Ene24 | Dic23 | Nov23 | Oct23 | Sep23 | Ago23 | Jul23 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
Clientes | 42 | 42 | 41 | 38 | 39 | 33 | 45 | 50 | 171 | 171 | 170 | 170 |
% Nivel Cobranza | 0.00% | 124.26% | 96.34% | 84.50% | 109.97% | 98.85% | 106.12% | 106.57% | 88.80% | 92.44% | 95.39% | 89.74% |
% Nivel Pérdida | 0.00% | 56.29% | -22.85% | 39.28% | -104.11% | 21.01% | -11.03% | -16.98% | 50.30% | 47.19% | 18.68% | 53.84% |
Energía Suministrada (GWh) | 0 | 0.23 | 0.1 | 0.2 | 0.05 | 0.14 | 0.1 | 0.1 | 0.23 | 0.21 | 0.13 | 0.22 |
Energía Facturada (GWh) | 0 | 0.1 | 0.12 | 0.12 | 0.1 | 0.11 | 0.11 | 0.12 | 0.11 | 0.11 | 0.11 | 0.1 |
Energía Cobrada (GWh) | 0 | 0.12 | 0.12 | 0.1 | 0.11 | 0.11 | 0.12 | 0.13 | 0.1 | 0.1 | 0.1 | 0.09 |
% Servicio | 97.86% | 99.18% | 99.41% | 99.10% | 99.28% | 98.00% | 99.94% | 99.03% | 98.96% | 99.41% | 96.54% | 98.97% |
% Sin Servicio | 2.14% | 0.82% | 0.59% | 0.90% | 0.72% | 2.00% | 0.06% | 0.97% | 1.04% | 0.59% | 3.46% | 1.03% |
Interrupción Programada (Hrs) | 20.00 | 0.00 | 7.00 | 0.00 | 3.00 | 3.00 | 4.00 | 3.00 | 1.00 | 5.00 | 6.00 | 6.00 |
Interrupción Ejecutada (Hrs) | 15.61 | 5.99 | 4.32 | 6.54 | 5.25 | 14.57 | 0.41 | 7.09 | 7.58 | 4.34 | 25.23 | 7.55 |
Promedio Interrupción Diarias (Hrs) | 0.51 | 0.20 | 0.14 | 0.21 | 0.17 | 0.48 | 0.01 | 0.23 | 0.25 | 0.14 | 0.83 | 0.25 |
Parador Turey, Parador Taveras, El Puerto, La Cumbre, Rancho La Cumbre, Bo. Puerto Rico, Batey 61, Los Ganchos, El Campito.