Circuito CUMB401

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación D D D D D D D D D A B D
Clientes 1778 1778 1682 1668 1668 1681 1678 1659 1626 1598 1579 1578
% Nivel Cobranza 0.00% 94.00% 99.09% 102.15% 81.53% 101.10% 75.01% 85.64% 94.39% 76.87% 109.06% 84.13%
% Nivel Pérdida 0.00% 47.84% 50.70% 53.20% 50.69% 55.02% 48.81% 57.48% 56.40% 52.17% 64.39% 52.59%
Energía Suministrada (GWh) 0 0.71 0.83 0.86 0.87 0.96 1.01 1.06 0.98 0.9 0.95 0.85
Energía Facturada (GWh) 0 0.37 0.41 0.40 0.43 0.43 0.52 0.45 0.43 0.43 0.34 0.4
Energía Cobrada (GWh) 0 0.35 0.40 0.41 0.35 0.44 0.39 0.39 0.4 0.33 0.37 0.34
% Servicio 99.04% 97.11% 99.37% 99.20% 96.96% 97.47% 96.08% 97.15% 96.19% 95.92% 99.17% 97.90%
% Sin Servicio 0.96% 2.89% 0.63% 0.80% 3.04% 2.53% 3.92% 2.85% 3.81% 4.08% 0.83% 2.10%
Interrupción Programada (Hrs) 3.00 5.00 0.00 0.00 4.00 3.00 17.00 8.00 9.00 9.00 12.00 9.00
Interrupción Ejecutada (Hrs) 6.93 20.80 4.52 5.98 22.20 18.49 28.59 20.78 27.78 29.75 6.04 15.31
Promedio Interrupción Diarias (Hrs) 0.23 0.68 0.15 0.20 0.73 0.61 0.94 0.68 0.91 0.98 0.20 0.50
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Parador Turey, Parador Taveras, El Puerto, La Cumbre, Rancho La Cumbre, Bo. Puerto Rico, Batey 61, Los Ganchos, El Campito.