Circuito CUMB401

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación D D D A B D D D A A A A
Clientes 1659 1659 1626 1598 1579 1578 1564 1514 1497 1475 1389 1385
% Nivel Cobranza 0.00% 85.64% 94.39% 76.87% 109.06% 84.13% 89.12% 89.43% 93.49% 81.47% 91.63% 89.89%
% Nivel Pérdida 0.00% 57.48% 56.40% 52.17% 64.39% 52.59% 56.06% 44.83% 52.39% 55.76% 56.22% 66.78%
Energía Suministrada (GWh) 0 1.06 0.98 0.9 0.95 0.85 0.9 0.72 0.83 0.89 0.85 1.05
Energía Facturada (GWh) 0 0.45 0.43 0.43 0.34 0.4 0.4 0.4 0.4 0.39 0.37 0.35
Energía Cobrada (GWh) 0 0.39 0.4 0.33 0.37 0.34 0.35 0.36 0.37 0.32 0.34 0.31
% Servicio 96.08% 97.15% 96.19% 95.92% 99.17% 97.90% 97.83% 97.45% 97.88% 98.67% 99.11% 98.15%
% Sin Servicio 3.92% 2.85% 3.81% 4.08% 0.83% 2.10% 2.17% 2.55% 2.12% 1.33% 0.89% 1.85%
Interrupción Programada (Hrs) 17.00 8.00 9.00 9.00 12.00 9.00 8.00 12.00 10.00 6.00 9.00 3.00
Interrupción Ejecutada (Hrs) 28.59 20.78 27.78 29.75 6.04 15.31 15.84 18.59 15.48 9.70 6.53 13.50
Promedio Interrupción Diarias (Hrs) 0.94 0.68 0.91 0.98 0.20 0.50 0.52 0.61 0.51 0.32 0.21 0.44
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Parador Turey, Parador Taveras, El Puerto, La Cumbre, Rancho La Cumbre, Bo. Puerto Rico, Batey 61, Los Ganchos, El Campito.