Circuito CSAT102
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | A | B | C | C | C | A | A | A | A | A | A |
Clientes | 3415 | 3415 | 3413 | 3390 | 3392 | 3385 | 3394 | 3396 | 3406 | 3409 | 3399 | 3398 |
% Nivel Cobranza | 0.00% | 122.55% | 68.80% | 93.72% | 173.06% | 71.08% | 65.21% | 104.28% | 95.33% | 102.95% | 96.51% | 104.89% |
% Nivel Pérdida | 0.00% | 44.30% | 50.20% | 41.63% | 53.01% | 35.79% | 36.49% | 42.85% | 32.08% | 45.21% | 42.14% | 46.78% |
Energía Suministrada (GWh) | 0 | 0.87 | 0.89 | 0.77 | 0.82 | 0.59 | 0.7 | 0.77 | 0.74 | 0.92 | 0.91 | 0.94 |
Energía Facturada (GWh) | 0 | 0.48 | 0.44 | 0.45 | 0.39 | 0.38 | 0.45 | 0.44 | 0.5 | 0.51 | 0.53 | 0.5 |
Energía Cobrada (GWh) | 0 | 0.59 | 0.3 | 0.42 | 0.67 | 0.27 | 0.29 | 0.46 | 0.48 | 0.52 | 0.51 | 0.53 |
% Servicio | 99.73% | 99.10% | 98.27% | 98.28% | 98.64% | 96.40% | 92.51% | 99.52% | 99.41% | 97.14% | 98.14% | 99.66% |
% Sin Servicio | 0.27% | 0.90% | 1.73% | 1.72% | 1.36% | 3.60% | 7.49% | 0.48% | 0.59% | 2.86% | 1.86% | 0.34% |
Interrupción Programada (Hrs) | 0.00 | 3.00 | 7.00 | 3.00 | 4.00 | 18.00 | 41.00 | 0.00 | 0.00 | 3.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 1.99 | 6.55 | 12.61 | 12.54 | 9.92 | 26.28 | 54.69 | 3.50 | 4.34 | 20.86 | 13.56 | 2.48 |
Promedio Interrupción Diarias (Hrs) | 0.07 | 0.22 | 0.41 | 0.41 | 0.33 | 0.86 | 1.80 | 0.11 | 0.14 | 0.69 | 0.45 | 0.08 |
Ciudad Satélite, Ciudad Satélite II, CENI, Aluminio Rhomer, Bon Agroindustrial, Distribuidora Diez Febles, ORANGE, Resid. Parque del Sol, Bo. Villa Linda.