Circuito CSAT101C

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C A B C C C D A
Clientes 18 18 18 17 19 18 17 17 17 17 17 16
% Nivel Cobranza 0.00% 44.57% 67.76% 45.80% 58.85% 49.46% 63.79% 48.26% 65.71% 51.48% 42.73% 63.63%
% Nivel Pérdida 0.00% 99.52% 99.48% 98.21% 98.34% 98.59% 98.63% 98.42% 98.69% 98.42% 98.38% 98.68%
Energía Suministrada (GWh) 0 0.93 0.98 0.25 0.23 0.21 0.21 0.19 0.2 0.16 0.18 0.19
Energía Facturada (GWh) 0 0.00 0.01 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0.00 0 0 0 0 0 0 0 0 0 0
% Servicio 91.86% 88.10% 93.09% 95.44% 91.51% 92.82% 95.57% 93.44% 95.43% 93.51% 95.95% 95.57%
% Sin Servicio 8.14% 11.90% 6.91% 4.56% 8.49% 7.18% 4.43% 6.56% 4.57% 6.49% 4.05% 4.43%
Interrupción Programada (Hrs) 10.00 20.00 7.00 8.00 14.00 14.00 2.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 59.41 86.87 50.47 33.28 62.01 52.42 32.32 47.89 33.39 47.37 29.58 32.37
Promedio Interrupción Diarias (Hrs) 1.95 2.86 1.66 1.09 2.04 1.72 1.06 1.57 1.10 1.56 0.97 1.06
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Las Merdeces, Bo. La Esperanza, El pedregal