Circuito CSAT101
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | A | B | C | C | C |
| Clientes | 9489 | 9505 | 9505 | 9489 | 9472 | 9479 | 9461 | 9353 | 9226 | 9174 | 9191 | 9191 |
| % Nivel Cobranza | 0.00% | 0.00% | 77.71% | 97.68% | 92.07% | 117.58% | 100.48% | 90.76% | 73.29% | 95.75% | 138.06% | 96.31% |
| % Nivel Pérdida | 0.00% | 0.00% | -13.88% | -7.37% | -0.19% | 32.37% | 30.37% | 23.48% | 31.60% | 21.02% | 34.87% | 13.58% |
| Energía Suministrada (GWh) | 0 | 0 | 1.40 | 1.67 | 1.83 | 2.65 | 2.41 | 2.18 | 2.23 | 1.97 | 2.1 | 1.65 |
| Energía Facturada (GWh) | 0 | 0 | 1.59 | 1.79 | 1.84 | 1.79 | 1.68 | 1.67 | 1.52 | 1.55 | 1.37 | 1.43 |
| Energía Cobrada (GWh) | 0 | 0 | 1.24 | 1.75 | 1.69 | 2.1 | 1.69 | 1.51 | 1.12 | 1.49 | 1.89 | 1.37 |
| % Servicio | 99.40% | 98.79% | 97.71% | 98.87% | 98.33% | 97.80% | 98.51% | 98.64% | 97.08% | 97.62% | 97.71% | 96.35% |
| % Sin Servicio | 0.60% | 1.21% | 2.29% | 1.13% | 1.67% | 2.20% | 1.49% | 1.36% | 2.92% | 2.38% | 2.29% | 3.65% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 3.00 | 0.00 | 0.00 | 0.00 | 7.00 | 6.00 | 4.00 | 18.00 |
| Interrupción Ejecutada (Hrs) | 4.30 | 9.01 | 16.74 | 8.24 | 12.18 | 16.03 | 10.89 | 9.93 | 21.34 | 17.35 | 16.71 | 26.64 |
| Promedio Interrupción Diarias (Hrs) | 0.14 | 0.30 | 0.55 | 0.27 | 0.40 | 0.53 | 0.36 | 0.33 | 0.70 | 0.57 | 0.55 | 0.88 |
KM. 25 Autopista Duarte, Pedro Brand (parcial) , Bo. Eduardo Brito, Urb. Flor de Loto, Las Mercedes y La Unión del Municipio de Pedro Brand, Los Corozos.