Buscar Circuitos Glosario

Circuito COTU103

Distribuidora EdeNorte - Provincia Sanchez Ramirez


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 5026 5026 5052 5058 5079 5053 5060 5037 5007 113 123 122
% Nivel Cobranza 0.00% 83.37% 92.87% 98.40% 88.17% 88.96% 98.46% 99.84% 91.62% 81.18% 81.23% 86.90%
% Nivel Pérdida 0.00% 64.12% 61.23% 61.32% 54.22% 61.03% 62.30% 61.05% 63.62% 75.81% 77.87% 77.67%
Energía Suministrada (GWh) 0 3.69 3.2 3.01 2.76 3.08 3.16 3.28 3.66 1.49 1.66 1.54
Energía Facturada (GWh) 0 1.33 1.24 1.16 1.26 1.2 1.19 1.28 1.33 0.36 0.37 0.34
Energía Cobrada (GWh) 0 1.1 1.15 1.14 1.11 1.07 1.17 1.27 1.22 0.29 0.3 0.3
% Servicio 98.32% 99.96% 98.10% 99.19% 97.60% 98.71% 98.67% 97.98% 97.49% 97.86% 96.45% 98.15%
% Sin Servicio 1.68% 0.04% 1.90% 0.81% 2.40% 1.29% 1.33% 2.02% 2.51% 2.14% 3.55% 1.85%
Interrupción Programada (Hrs) 6.00 0.00 2.00 0.00 5.00 1.00 6.00 0.00 0.00 0.00 12.00 6.00
Interrupción Ejecutada (Hrs) 12.13 0.31 13.68 5.81 17.26 9.30 9.90 14.73 18.31 15.61 25.89 13.48
Promedio Interrupción Diarias (Hrs) 0.40 0.01 0.45 0.19 0.57 0.31 0.33 0.48 0.60 0.51 0.85 0.44
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito COTU103
Interrupciones Programadas 5
Interrupciones Ejecutadas 19.29
% Ejecución Operativa 385.80%
Detalle de Salidas - Circuito COTU103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 14:00:00 19:00:00 5 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 18:21:34 18:34:45 2.37 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 17:26:02 18:20:00 2.37 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 16:26:46 16:40:03 2.37 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 15:47:09 15:58:34 2.37 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
08/07/2026 Ejecutada 13:44:00 14:34:06 2.37 APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO
07/07/2026 Ejecutada 07:34:25 07:37:50 0.06 ACTUACION BAJA FRECUENCIA (81)
04/07/2026 Ejecutada 15:59:33 16:04:26 0.08 ACTUACION BAJA FRECUENCIA (81)
02/07/2026 Ejecutada 15:02:25 15:17:40 0.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION
01/07/2026 Ejecutada 10:07:25 10:14:33 1.41 ANIMALES
01/07/2026 Ejecutada 09:17:22 09:58:07 1.41 ANIMALES
01/07/2026 Ejecutada 08:51:26 09:17:09 1.41 ANIMALES
01/07/2026 Ejecutada 08:42:10 08:49:56 1.41 ANIMALES
01/07/2026 Ejecutada 08:38:26 08:41:44 1.41 ANIMALES
INAPA. - Factoría Jerez, Block Caba.