Circuito COTU103

Distribuidora EdeNorte - Provincia Sanchez Ramirez


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D D D D D D D D
Clientes 5007 5007 113 123 122 120 120 117 115 118 124 118
% Nivel Cobranza 0.00% 91.62% 81.18% 81.23% 86.90% 106.88% 147.02% 94.31% 104.29% 92.63% 38.81% 112.44%
% Nivel Pérdida 0.00% 63.62% 75.81% 77.87% 77.67% 77.01% 72.32% 68.38% 72.24% 63.26% 42.34% 74.55%
Energía Suministrada (GWh) 0 3.66 1.49 1.66 1.54 1.46 1.43 1.3 1.39 1.12 1.21 1.18
Energía Facturada (GWh) 0 1.33 0.36 0.37 0.34 0.34 0.4 0.41 0.39 0.41 0.7 0.3
Energía Cobrada (GWh) 0 1.22 0.29 0.3 0.3 0.36 0.58 0.39 0.4 0.38 0.27 0.34
% Servicio 97.98% 97.49% 97.86% 96.45% 98.15% 98.68% 97.47% 99.04% 99.14% 99.74% 96.67% 99.78%
% Sin Servicio 2.02% 2.51% 2.14% 3.55% 1.85% 1.32% 2.53% 0.96% 0.86% 0.26% 3.33% 0.22%
Interrupción Programada (Hrs) 0.00 0.00 0.00 12.00 6.00 0.00 1.00 1.00 0.00 0.00 20.00 0.00
Interrupción Ejecutada (Hrs) 14.73 18.31 15.61 25.89 13.48 9.63 18.46 7.00 6.27 1.93 24.29 1.57
Promedio Interrupción Diarias (Hrs) 0.48 0.60 0.51 0.85 0.44 0.32 0.61 0.23 0.21 0.06 0.80 0.05
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

INAPA. - Factoría Jerez, Block Caba.