Buscar Circuitos Glosario

Circuito COTU102PLA

Distribuidora EdeNorte - Provincia Espaillat


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación D D D D D D D D D D D C
Clientes 512 494 493 491 552 502 502 506 505 506 495 0
% Nivel Cobranza 86.92% 96.86% 80.11% 74.00% 84.60% 108.53% 2.01% 78.28% 90.80% 84.00% 90.76% 69.52%
% Nivel Pérdida 68.95% 67.19% 65.16% 62.46% 66.74% 73.52% 66.08% 63.13% 65.58% 62.52% 65.87% 64.75%
Energía Suministrada (GWh) 0.3 0.26 0.27 0.26 0.28 0.28 0.28 0.28 0.28 0.27 0.28 0.28
Energía Facturada (GWh) 0.09 0.08 0.1 0.1 0.09 0.07 0.1 0.1 0.1 0.1 0.1 0.1
Energía Cobrada (GWh) 0.08 0.08 0.08 0.07 0.08 0.08 0 0.08 0.09 0.09 0.09 0.07
% Servicio 97.93% 99.34% 98.89% 99.78% 97.18% 99.18% 95.37% 97.73% 96.02% 97.28% 98.01% 0.00%
% Sin Servicio 2.07% 0.66% 1.11% 0.22% 2.82% 0.82% 4.63% 2.27% 3.98% 2.72% 1.99% 0.00%
Interrupción Programada (Hrs) 1.00 1.00 4.00 5.00 16.00 0.00 8.00 13.00 10.00 22.00 8.00 0.00
Interrupción Ejecutada (Hrs) 15.12 4.80 8.11 1.59 20.59 6.01 33.78 16.58 29.07 19.83 14.55 0.00
Promedio Interrupción Diarias (Hrs) 0.50 0.16 0.27 0.05 0.68 0.20 1.11 0.55 0.96 0.65 0.48 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito COTU102PLA
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.55
% Ejecución Operativa 0%
Detalle de Salidas - Circuito COTU102PLA
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
11/06/2025 Ejecutada 13:30:40 13:35:24 0.08 DISPARO DESCONOCIDO
08/06/2025 Ejecutada 14:28:07 14:31:26 0.06 DISPARO DESCONOCIDO
05/06/2025 Ejecutada 13:11:54 13:35:00 0.39 FALLAS ETED, DISPARO DE LINEA TRANSMISION
04/06/2025 Ejecutada 17:55:53 18:14:33 0.51 FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // SUSTITUCION TRANSFORMADOR MT
04/06/2025 Ejecutada 12:31:16 12:42:53 0.51 FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // SUSTITUCION TRANSFORMADOR MT
Hato de Caciano, Castillo, Chaquel, El Tope.