Circuito COTU102
Distribuidora EdeNorte - Provincia Sanchez Ramirez
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 19557 | 19557 | 19487 | 19463 | 19442 | 19271 | 19194 | 19082 | 18905 | 18840 | 18746 | 18520 |
| % Nivel Cobranza | 0.00% | 89.86% | 88.56% | 105.09% | 89.99% | 93.67% | 109.20% | 97.88% | 102.61% | 90.08% | 87.41% | 99.57% |
| % Nivel Pérdida | 0.00% | 31.83% | 23.97% | 28.45% | 14.39% | 22.87% | 24.94% | 20.07% | 22.55% | 24.92% | 31.39% | 33.21% |
| Energía Suministrada (GWh) | 0 | 7.61 | 6.31 | 5.95 | 5.41 | 5.98 | 6.24 | 6.63 | 7.6 | 8.25 | 8.49 | 7.76 |
| Energía Facturada (GWh) | 0 | 5.19 | 4.79 | 4.26 | 4.63 | 4.62 | 4.68 | 5.3 | 5.89 | 6.19 | 5.82 | 5.18 |
| Energía Cobrada (GWh) | 0 | 4.66 | 4.25 | 4.48 | 4.17 | 4.32 | 5.11 | 5.19 | 6.04 | 5.58 | 5.09 | 5.16 |
| % Servicio | 98.33% | 98.32% | 96.07% | 98.43% | 98.70% | 99.20% | 97.65% | 97.31% | 98.04% | 97.90% | 98.34% | 99.13% |
| % Sin Servicio | 1.67% | 1.68% | 3.93% | 1.57% | 1.30% | 0.80% | 2.35% | 2.69% | 1.96% | 2.10% | 1.66% | 0.87% |
| Interrupción Programada (Hrs) | 6.00 | 10.00 | 12.00 | 0.00 | 0.00 | 1.00 | 11.00 | 5.00 | 5.00 | 1.00 | 1.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 12.03 | 12.09 | 28.30 | 11.27 | 9.38 | 5.79 | 17.52 | 19.63 | 14.28 | 15.35 | 12.09 | 6.34 |
| Promedio Interrupción Diarias (Hrs) | 0.40 | 0.40 | 0.93 | 0.37 | 0.31 | 0.19 | 0.58 | 0.65 | 0.47 | 0.50 | 0.40 | 0.21 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 08/07/2026 | Programada | 14:00:00 | 19:00:00 | 5 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 08/07/2026 | Ejecutada | 15:46:54 | 16:21:28 | 1.49 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 08/07/2026 | Ejecutada | 15:28:20 | 15:32:28 | 1.49 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 08/07/2026 | Ejecutada | 13:43:50 | 14:34:13 | 1.49 | APERTURA DE LINEA DE TRANSMISION // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 15:04:28 | 15:08:35 | 0.28 | PODA PREVENTIVO |
| 06/07/2026 | Ejecutada | 10:05:34 | 10:18:01 | 0.28 | PODA PREVENTIVO |
| 04/07/2026 | Ejecutada | 17:22:05 | 17:27:22 | 0.09 | DISPARO DESCONOCIDO |
| 03/07/2026 | Ejecutada | 21:07:36 | 21:15:12 | 0.19 | DISPARO DESCONOCIDO // PUENTE ROTO |
| 03/07/2026 | Ejecutada | 18:21:58 | 18:26:00 | 0.19 | DISPARO DESCONOCIDO // PUENTE ROTO |
| 02/07/2026 | Ejecutada | 15:21:04 | 19:45:38 | 4.67 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 02/07/2026 | Ejecutada | 15:01:53 | 15:17:35 | 4.67 | CORRECTIVO EN CONDUCTOR DE FASE // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 01/07/2026 | Ejecutada | 00:11:53 | 00:36:50 | 0.42 | SUSTITUCION TRANSFORMADOR MT |