Circuito CONS401

Distribuidora EdeNorte - Provincia La Vega


Mes-Año May21 Abr21 Mar21 Feb21 Ene21 Dic20 Nov20 Oct20 Sep20 Ago20 Jul20 Jun20
Clasificación A A A A A A A A A A A A
Clientes 1 1205 1164 1153 1152 1128 1135 1135 1124 1117 1109 1112
% Nivel Cobranza 7.21% 78.92% 80.66% 82.06% 76.20% 76.19% 85.68% 88.99% 99.78% 84.90% 102.40% 104.46%
% Nivel Pérdida 70.95% -9.92% -3.94% -17.59% 8.73% 1.16% -4.41% 4.56% -6.89% -4.75% 1.40% 2.07%
Energía Suministrada (GWh) 0.1 0.19 0.19 0.17 0.2 0.2 0.18 0.19 0.17 0.18 0.19 0.19
Energía Facturada (GWh) 0.03 0.21 0.2 0.2 0.18 0.2 0.19 0.18 0.19 0.19 0.18 0.19
Energía Cobrada (GWh) 0 0.16 0.16 0.17 0.14 0.15 0.16 0.16 0.18 0.16 0.19 0.2
% Servicio 98.33% 98.64% 99.50% 99.33% 99.91% 99.93% 100.00% 98.68% 98.80% 98.10% 99.03% 99.50%
% Sin Servicio 1.67% 1.36% 0.50% 0.67% 0.09% 0.07% 0.00% 1.32% 1.20% 1.90% 0.97% 0.50%
Interrupción Programada (Hrs) 5.00 5.00 6.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 10.00 0.00
Interrupción Ejecutada (Hrs) 12.17 9.93 3.64 4.91 0.69 0.54 0.00 9.62 8.76 13.89 7.08 3.62
Promedio Interrupción Diarias (Hrs) 0.40 0.33 0.12 0.16 0.02 0.02 0.00 0.32 0.29 0.46 0.23 0.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CONS401
Interrupciones Programadas 5.00
Interrupciones Ejecutadas 5.34
% Ejecución Operativa 106.80%
Detalle de Salidas - Circuito CONS401
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
15/05/2021 Programada 08:00:00 13:00:00 5.00 APERTURA DE LINEA DE TRANSMISION
15/05/2021 Ejecutada 08:31:00 13:40:00 5.09 APERTURA DE LINEA DE TRANSMISION
11/05/2021 Ejecutada 18:46:00 18:43:00 0.25 FACILITAR TRABAJO A TERCERO
La Colonia Japonesa, El Convento, La Culata, Los Corralitos, La Sabina (Parcial).