Circuito CONS02
Distribuidora EdeEste - Provincia San Pedro De Macoris
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D | D | D | D | D | D | D |
| Clientes | 7278 | 7278 | 7270 | 7264 | 7234 | 7228 | 8292 | 5199 | 6962 | 6060 | 6084 | 7034 |
| % Nivel Cobranza | 0.00% | 79.37% | 80.33% | 87.88% | 77.14% | 89.66% | 84.31% | 92.17% | 82.66% | 79.09% | 79.69% | 81.31% |
| % Nivel Pérdida | 0.00% | 74.71% | 71.74% | 71.06% | 68.03% | 71.77% | 65.52% | 74.54% | 69.95% | 73.08% | 75.56% | 73.01% |
| Energía Suministrada (GWh) | 0 | 6.49 | 5.44 | 5.14 | 4.50 | 5.15 | 5.34 | 4.87 | 5.16 | 5.34 | 5.66 | 5.53 |
| Energía Facturada (GWh) | 0 | 1.64 | 1.54 | 1.49 | 1.44 | 1.45 | 1.84 | 1.24 | 1.55 | 1.44 | 1.38 | 1.49 |
| Energía Cobrada (GWh) | 0 | 1.30 | 1.24 | 1.31 | 1.11 | 1.30 | 1.55 | 1.14 | 1.28 | 1.14 | 1.10 | 1.22 |
| % Servicio | 97.73% | 98.86% | 98.50% | 98.34% | 97.11% | 98.20% | 98.51% | 97.33% | 98.62% | 98.53% | 97.86% | 98.40% |
| % Sin Servicio | 2.27% | 1.14% | 1.50% | 1.66% | 2.89% | 1.80% | 1.49% | 2.67% | 1.38% | 1.47% | 2.14% | 1.60% |
| Interrupción Programada (Hrs) | 13.00 | 5.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 4.00 |
| Interrupción Ejecutada (Hrs) | 16.37 | 8.23 | 10.80 | 11.93 | 20.82 | 12.95 | 11.10 | 19.47 | 10.05 | 10.70 | 15.63 | 11.70 |
| Promedio Interrupción Diarias (Hrs) | 0.54 | 0.27 | 0.36 | 0.39 | 0.68 | 0.43 | 0.36 | 0.64 | 0.33 | 0.35 | 0.51 | 0.38 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 04/07/2026 | Ejecutada | 22:07:00 | 22:14:00 | 0.20 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 04/07/2026 | Ejecutada | 15:58:00 | 16:03:00 | 0.20 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 02/07/2026 | Ejecutada | 16:48:00 | 18:13:00 | 1.68 | TRANSMISION - SALIDA DE LINEA 69 KV // TRANSMISION - FACILITAR TRABAJOS TRANSMISION |
| 02/07/2026 | Ejecutada | 12:02:00 | 12:18:00 | 1.68 | TRANSMISION - SALIDA DE LINEA 69 KV // TRANSMISION - FACILITAR TRABAJOS TRANSMISION |