Buscar Circuitos Glosario

Circuito COHE105

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación B B B B B B B B B B B B
Clientes 8900 8900 4386 4381 4344 4347 5083 5069 5069 5113 5099 5395
% Nivel Cobranza 0.00% 86.15% 86.29% 93.63% 95.77% 97.19% 97.75% 105.48% 85.20% 114.72% 85.50% 112.90%
% Nivel Pérdida 0.00% 25.24% 31.36% 10.96% 16.19% 4.56% 7.73% 10.05% 8.27% 6.96% 8.24% 18.70%
Energía Suministrada (GWh) 0 6.01 4.24 3.28 3.31 2.90 3.20 3.52 3.54 3.85 4.16 4.55
Energía Facturada (GWh) 0 4.50 2.91 2.92 2.77 2.77 2.95 3.17 3.24 3.58 3.82 3.7
Energía Cobrada (GWh) 0 3.87 2.51 2.74 2.66 2.69 2.88 3.34 2.76 4.11 3.26 4.18
% Servicio 99.19% 99.70% 98.28% 98.28% 98.88% 98.21% 99.96% 99.95% 98.28% 98.50% 99.54% 99.46%
% Sin Servicio 0.81% 0.30% 1.72% 1.72% 1.12% 1.79% 0.04% 0.05% 1.72% 1.50% 0.46% 0.54%
Interrupción Programada (Hrs) 10.00 5.00 10.00 10.00 2.00 1.00 0.00 0.00 0.00 5.00 3.00 0.00
Interrupción Ejecutada (Hrs) 5.85 2.14 12.40 12.40 8.03 12.89 0.28 0.38 12.56 10.97 3.33 3.97
Promedio Interrupción Diarias (Hrs) 0.19 0.07 0.41 0.41 0.26 0.42 0.01 0.01 0.41 0.36 0.11 0.13
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito COHE105
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.43
% Ejecución Operativa 0%
Detalle de Salidas - Circuito COHE105
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
16/08/2026 Ejecutada 01:09:20 01:19:41 0.17 FALLA TRANSITORIA //
11/08/2026 Ejecutada 09:24:54 09:35:12 0.17 FALLA TRANSITORIA //
09/08/2026 Ejecutada 09:58:17 10:03:55 0.09 FALLA TRANSITORIA //
ALMADECA, CONGELASA, Cilindros Nacionales, Muelles y Frenos, ALFA Motors, Plaza Luperón, Hogar Escuela Santo Domingo Sabio, Hogar de Ancianos, Resid. Sandra I y II, Resid. Mar Caribe, Urb. Costa Verde, Urb. Costa Azul, Res. Mirador del Oeste, Barrio Nuevo en Haina Oriental, Manresa, Bo. El Castillo.