Circuito COHE103C

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C A B C C C A A
Clientes 135 135 138 139 140 142 145 145 145 148 147 147
% Nivel Cobranza 0.00% 118.60% 89.04% 89.77% 92.74% 89.02% 113.98% 97.73% 116.69% 78.18% 99.88% 114.72%
% Nivel Pérdida 0.00% 88.27% 86.02% 88.22% 88.33% 87.08% 88.45% 82.64% 86.66% 81.78% 80.76% 83.78%
Energía Suministrada (GWh) 0 0.24 0.26 0.27 0.25 0.23 0.23 0.16 0.18 0.14 0.15 0.17
Energía Facturada (GWh) 0 0.03 0.04 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03
Energía Cobrada (GWh) 0 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03
% Servicio 97.49% 96.90% 99.60% 98.61% 97.03% 96.63% 99.57% 99.99% 100.00% 100.00% 100.00% 99.99%
% Sin Servicio 2.51% 3.10% 0.40% 1.39% 2.97% 3.37% 0.43% 0.01% 0.00% 0.00% 0.00% 0.01%
Interrupción Programada (Hrs) 8.00 14.00 6.00 5.00 14.00 18.00 2.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 18.32 22.66 2.95 10.15 21.67 24.60 3.11 0.05 0.03 0.00 0.00 0.09
Promedio Interrupción Diarias (Hrs) 0.60 0.74 0.10 0.33 0.71 0.81 0.10 0.00 0.00 0.00 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

C/1RA ABANICO HERRERA ESQ. CARR. EMGOMBE