Circuito COHE103B

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 1123 1123 1127 1130 1121 1119 1113 1116 1121 1112 1116 1132
% Nivel Cobranza 0.00% 96.20% 102.73% 85.94% 109.54% 81.32% 109.90% 88.12% 105.22% 105.63% 96.53% 104.90%
% Nivel Pérdida 0.00% 66.60% 67.43% 62.64% 66.05% 59.35% 63.81% 0.00% 0.00% 85.98% 84.92% 84.92%
Energía Suministrada (GWh) 0 1.3 1.24 1.14 1.06 0.98 0.93 0 0 2.65 2.77 2.77
Energía Facturada (GWh) 0 0.44 0.4 0.42 0.36 0.4 0.34 0.36 0.35 0.37 0.42 0.42
Energía Cobrada (GWh) 0 0.42 0.42 0.37 0.39 0.32 0.37 0.32 0.36 0.39 0.4 0.44
% Servicio 99.34% 97.76% 97.45% 97.55% 99.19% 99.88% 99.96% 99.92% 99.97% 99.79% 99.97% 99.26%
% Sin Servicio 0.66% 2.24% 2.55% 2.45% 0.81% 0.12% 0.04% 0.08% 0.03% 0.21% 0.03% 0.74%
Interrupción Programada (Hrs) 6.00 3.00 14.00 16.00 2.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 4.84 16.38 18.61 17.92 5.88 0.90 0.27 0.57 0.21 1.57 0.23 5.40
Promedio Interrupción Diarias (Hrs) 0.16 0.54 0.61 0.59 0.19 0.03 0.01 0.02 0.01 0.05 0.01 0.18
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Carretera Engombe (parcial), El Abanico (parcial), Finca Engombe.