Circuito COHE103B

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación C C C C C C C C C A B C
Clientes 1415 1415 1141 1137 1137 1139 1134 1123 1127 1130 1121 1119
% Nivel Cobranza 0.00% 77.39% 105.63% 103.68% 103.51% 98.81% 94.02% 96.20% 102.73% 85.94% 109.54% 81.32%
% Nivel Pérdida 0.00% 56.33% 62.92% 61.77% 59.04% 63.45% 64.93% 66.60% 67.43% 62.64% 66.05% 59.35%
Energía Suministrada (GWh) 0 0.90 0.96 1.04 1.00 1.22 1.34 1.3 1.24 1.14 1.06 0.98
Energía Facturada (GWh) 0 0.39 0.36 0.40 0.41 0.45 0.47 0.44 0.4 0.42 0.36 0.4
Energía Cobrada (GWh) 0 0.30 0.38 0.41 0.42 0.44 0.44 0.42 0.42 0.37 0.39 0.32
% Servicio 96.60% 97.11% 99.18% 98.95% 97.21% 97.44% 99.34% 97.76% 97.45% 97.55% 99.19% 99.88%
% Sin Servicio 3.40% 2.89% 0.82% 1.05% 2.79% 2.56% 0.66% 2.24% 2.55% 2.45% 0.81% 0.12%
Interrupción Programada (Hrs) 16.00 13.00 13.00 10.00 12.00 14.00 6.00 3.00 14.00 16.00 2.00 0.00
Interrupción Ejecutada (Hrs) 24.50 20.80 5.92 7.84 20.39 18.69 4.84 16.38 18.61 17.92 5.88 0.90
Promedio Interrupción Diarias (Hrs) 0.81 0.68 0.19 0.26 0.67 0.61 0.16 0.54 0.61 0.59 0.19 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Carretera Engombe (parcial), El Abanico (parcial), Finca Engombe.