Circuito COHE103
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | A | B | C | C | C | A | A | A | A | A | A |
Clientes | 9415 | 9415 | 9410 | 9412 | 9407 | 9439 | 9445 | 9458 | 9502 | 9524 | 9676 | 13401 |
% Nivel Cobranza | 0.00% | 100.66% | 95.26% | 96.05% | 121.27% | 80.70% | 88.06% | 112.73% | 100.49% | 99.42% | 91.14% | 99.47% |
% Nivel Pérdida | 0.00% | 43.42% | 51.36% | 38.39% | 53.21% | 50.73% | 53.87% | -7789.51% | -464.12% | -20.02% | -42.47% | 15.36% |
Energía Suministrada (GWh) | 0 | 3.61 | 3.64 | 3.11 | 3.38 | 3.37 | 3.64 | 0.02 | 0.36 | 1.75 | 1.73 | 2.87 |
Energía Facturada (GWh) | 0 | 2.04 | 1.77 | 1.92 | 1.58 | 1.66 | 1.68 | 1.75 | 2.04 | 2.1 | 2.46 | 2.43 |
Energía Cobrada (GWh) | 0 | 2.06 | 1.69 | 1.84 | 1.92 | 1.34 | 1.48 | 1.97 | 2.05 | 2.09 | 2.24 | 2.42 |
% Servicio | 99.78% | 99.87% | 99.51% | 98.93% | 98.89% | 96.18% | 91.48% | 99.55% | 99.78% | 99.17% | 99.40% | 98.94% |
% Sin Servicio | 0.22% | 0.13% | 0.49% | 1.07% | 1.11% | 3.82% | 8.52% | 0.45% | 0.22% | 0.83% | 0.60% | 1.06% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 3.00 | 3.00 | 8.00 | 18.00 | 44.00 | 0.00 | 0.00 | 6.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 1.57 | 0.94 | 3.58 | 7.85 | 8.13 | 27.85 | 62.20 | 3.31 | 1.63 | 6.03 | 4.35 | 7.72 |
Promedio Interrupción Diarias (Hrs) | 0.05 | 0.03 | 0.12 | 0.26 | 0.27 | 0.92 | 2.04 | 0.11 | 0.05 | 0.20 | 0.14 | 0.25 |
Res. Santo Domingo Norte y Sur, El Abanico de Herrera, Ens. Altagracia de Herrera, Engombe, El Palmar, Bo. Engombe, Urb. Altos de Engombe, Lotificación Engombe.