Circuito COHE103

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 9407 9439 9445 9458 9502 9524 9676 13401 2192 2186 2181 2174
% Nivel Cobranza 121.27% 80.70% 88.06% 112.73% 100.49% 99.42% 91.14% 99.47% 97.44% 89.44% 103.00% 98.03%
% Nivel Pérdida 53.21% 50.73% 53.87% -7789.51% -464.12% -20.02% -42.47% 15.36% 43.85% 38.75% 50.37% 5.62%
Energía Suministrada (GWh) 3.38 3.37 3.64 0.02 0.36 1.75 1.73 2.87 2.61 2.38 2.55 1.26
Energía Facturada (GWh) 1.58 1.66 1.68 1.75 2.04 2.1 2.46 2.43 1.47 1.46 1.27 1.19
Energía Cobrada (GWh) 1.92 1.34 1.48 1.97 2.05 2.09 2.24 2.42 1.43 1.3 1.31 1.16
% Servicio 98.89% 96.18% 91.48% 99.55% 99.78% 99.17% 99.40% 98.94% 99.56% 99.67% 99.70% 99.64%
% Sin Servicio 1.11% 3.82% 8.52% 0.45% 0.22% 0.83% 0.60% 1.06% 0.44% 0.33% 0.30% 0.36%
Interrupción Programada (Hrs) 8.00 18.00 44.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.13 27.85 62.20 3.31 1.63 6.03 4.35 7.72 3.23 2.43 2.17 2.62
Promedio Interrupción Diarias (Hrs) 0.27 0.92 2.04 0.11 0.05 0.20 0.14 0.25 0.11 0.08 0.07 0.09
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Res. Santo Domingo Norte y Sur, El Abanico de Herrera, Ens. Altagracia de Herrera, Engombe, El Palmar, Bo. Engombe, Urb. Altos de Engombe, Lotificación Engombe.