Circuito COHE103
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | A | B | C | C | C | A | A |
| Clientes | 9398 | 9398 | 9400 | 9394 | 9405 | 9415 | 9410 | 9412 | 9407 | 9439 | 9445 | 9458 |
| % Nivel Cobranza | 0.00% | 106.51% | 86.27% | 103.67% | 90.35% | 100.66% | 95.26% | 96.05% | 121.27% | 80.70% | 88.06% | 112.73% |
| % Nivel Pérdida | 0.00% | 41.54% | 41.93% | 48.89% | 49.82% | 43.42% | 51.36% | 38.39% | 53.21% | 50.73% | 53.87% | -7789.51% |
| Energía Suministrada (GWh) | 0 | 3.69 | 4.03 | 4.32 | 3.96 | 3.61 | 3.64 | 3.11 | 3.38 | 3.37 | 3.64 | 0.02 |
| Energía Facturada (GWh) | 0 | 2.16 | 2.34 | 2.21 | 1.99 | 2.04 | 1.77 | 1.92 | 1.58 | 1.66 | 1.68 | 1.75 |
| Energía Cobrada (GWh) | 0 | 2.30 | 2.02 | 2.29 | 1.79 | 2.06 | 1.69 | 1.84 | 1.92 | 1.34 | 1.48 | 1.97 |
| % Servicio | 98.80% | 98.61% | 98.90% | 98.63% | 99.78% | 99.87% | 99.51% | 98.93% | 98.89% | 96.18% | 91.48% | 99.55% |
| % Sin Servicio | 1.20% | 1.39% | 1.10% | 1.37% | 0.22% | 0.13% | 0.49% | 1.07% | 1.11% | 3.82% | 8.52% | 0.45% |
| Interrupción Programada (Hrs) | 0.00 | 8.00 | 6.00 | 3.00 | 0.00 | 0.00 | 3.00 | 3.00 | 8.00 | 18.00 | 44.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 8.74 | 10.13 | 8.03 | 10.00 | 1.57 | 0.94 | 3.58 | 7.85 | 8.13 | 27.85 | 62.20 | 3.31 |
| Promedio Interrupción Diarias (Hrs) | 0.29 | 0.33 | 0.26 | 0.33 | 0.05 | 0.03 | 0.12 | 0.26 | 0.27 | 0.92 | 2.04 | 0.11 |
Res. Santo Domingo Norte y Sur, El Abanico de Herrera, Ens. Altagracia de Herrera, Engombe, El Palmar, Bo. Engombe, Urb. Altos de Engombe, Lotificación Engombe.