Circuito COHE102A
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 1 | 1314 | 1314 | 1314 | 1314 | 1318 | 1319 | 1319 | 2125 | 1318 | 1319 | 1317 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 101.22% | 106.89% | 112.94% | 111.56% | 102.63% | 87.41% | 91.95% | 100.96% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 4.64% | 11.01% | 11.54% | 7.47% | -113.29% | 4.15% | 20.86% | 15.42% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0.36 | 0.40 | 0.44 | 0.46 | 0.52 | 0.57 | 0.61 | 0.54 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0.35 | 0.36 | 0.39 | 0.42 | 1.11 | 0.55 | 0.48 | 0.46 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0.35 | 0.38 | 0.44 | 0.47 | 1.14 | 0.48 | 0.44 | 0.46 |
| % Servicio | 99.71% | 99.63% | 99.63% | 100.00% | 100.00% | 99.86% | 100.00% | 100.00% | 99.53% | 100.00% | 99.57% | 98.88% |
| % Sin Servicio | 0.29% | 0.37% | 0.37% | 0.00% | 0.00% | 0.14% | 0.00% | 0.00% | 0.47% | 0.00% | 0.43% | 1.12% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.06 | 2.67 | 2.67 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 3.40 | 0.00 | 3.14 | 8.21 |
| Promedio Interrupción Diarias (Hrs) | 0.07 | 0.09 | 0.09 | 0.00 | 0.00 | 0.03 | 0.00 | 0.00 | 0.11 | 0.00 | 0.10 | 0.27 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 28/06/2026 | Ejecutada | 19:17:50 | 20:10:17 | 1.08 | MANIOBRAS APERTURA/CIERRE (AVERIA) // REPOSICIÓN DE JUMPER // |
| 28/06/2026 | Ejecutada | 11:39:27 | 11:52:02 | 1.08 | MANIOBRAS APERTURA/CIERRE (AVERIA) // REPOSICIÓN DE JUMPER // |