Buscar Circuitos Glosario

Circuito COHE102

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 2403 2403 2399 2402 1074 1150 338 338 334 1145 4383 4387
% Nivel Cobranza 0.00% 97.95% 98.64% 97.14% 82.64% 87.67% 107.97% 63.68% 100.14% 92.01% 113.88% 87.44%
% Nivel Pérdida 0.00% 15.03% 5.11% -1.19% -14.64% -21.45% -21.38% 212.23% 69.36% -23.94% 10.27% 19.84%
Energía Suministrada (GWh) 0 1.27 1.08 1.04 0.60 0.63 0.67 -0.28 0.67 0.66 2.04 2.15
Energía Facturada (GWh) 0 1.08 1.02 1.05 0.69 0.77 0.81 0.31 0.20 0.82 1.83 1.72
Energía Cobrada (GWh) 0 1.06 1.01 1.02 0.57 0.67 0.88 0.20 0.21 0.75 2.08 1.51
% Servicio 99.73% 100.00% 100.00% 99.50% 98.98% 100.00% 99.77% 98.36% 99.45% 99.46% 99.63% 99.89%
% Sin Servicio 0.27% 0.00% 0.00% 0.50% 1.02% 0.00% 0.23% 1.64% 0.55% 0.54% 0.37% 0.11%
Interrupción Programada (Hrs) 5.00 0.00 0.00 2.00 0.00 0.00 0.00 3.00 5.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.91 0.00 0.00 3.60 7.31 0.00 1.72 11.95 4.04 3.98 2.73 0.81
Promedio Interrupción Diarias (Hrs) 0.06 0.00 0.00 0.12 0.24 0.00 0.06 0.39 0.13 0.13 0.09 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito COHE102
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.04
% Ejecución Operativa 0%
Detalle de Salidas - Circuito COHE102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
05/07/2026 Ejecutada 12:49:25 13:51:44 1.04 APERTURA OTRO CIRCUITO //
Res. José Contreras, Honduras del Norte, El Pedregal, Res. Don Oscar, Costa Criolla,