Circuito COHE101
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | A | B | D | D | D | A | A | A | A | A | A |
Clientes | 14587 | 14587 | 14525 | 14518 | 14518 | 14551 | 14538 | 14532 | 14592 | 14611 | 14599 | 9831 |
% Nivel Cobranza | 0.00% | 123.24% | 67.89% | 86.81% | 113.46% | 71.75% | 92.48% | 90.33% | 119.34% | 71.98% | 94.45% | 95.27% |
% Nivel Pérdida | 0.00% | 47.89% | 53.43% | 43.53% | 54.71% | 40.62% | 41.04% | 46.89% | 34.56% | 53.13% | 49.36% | 50.01% |
Energía Suministrada (GWh) | 0 | 3.76 | 3.76 | 3.26 | 3.37 | 2.68 | 2.91 | 3.3 | 3.12 | 4.51 | 3.87 | 3.23 |
Energía Facturada (GWh) | 0 | 1.96 | 1.75 | 1.84 | 1.53 | 1.59 | 1.72 | 1.75 | 2.04 | 2.11 | 1.96 | 1.62 |
Energía Cobrada (GWh) | 0 | 2.42 | 1.19 | 1.6 | 1.73 | 1.14 | 1.59 | 1.58 | 2.44 | 1.52 | 1.85 | 1.54 |
% Servicio | 98.85% | 99.65% | 98.95% | 98.89% | 97.45% | 94.60% | 90.39% | 99.77% | 98.27% | 98.45% | 98.21% | 98.06% |
% Sin Servicio | 1.15% | 0.35% | 1.05% | 1.11% | 2.55% | 5.40% | 9.61% | 0.23% | 1.73% | 1.55% | 1.79% | 1.94% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 5.00 | 3.00 | 8.00 | 30.00 | 48.00 | 0.00 | 0.00 | 6.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 8.42 | 2.52 | 7.68 | 8.13 | 18.59 | 39.44 | 70.15 | 1.70 | 12.65 | 11.31 | 13.07 | 14.13 |
Promedio Interrupción Diarias (Hrs) | 0.28 | 0.08 | 0.25 | 0.27 | 0.61 | 1.30 | 2.31 | 0.06 | 0.42 | 0.37 | 0.43 | 0.46 |
Km.12 de la Sánchez, Bo. Pte. Antonio Guzmán, Bo. San Martin, Bo. Los Químicos, El Café, Villas del Café I y II, Las Casas de Canaán, Villas del Café IV y V, Colinas de Canaán, KM 12, Loma del Chivo, Bo. Paraíso, C/ Dolly, Loma del Chivo, C/ Resp. Principal, C/ 2da, C/ 18, C/ Resp. 20, Callejón Arelis de la Flor del Café.