Circuito COHE101

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25
Clasificación D D D D D D D D D D A B
Clientes 8593 8593 8546 14706 14695 14695 14681 14672 14658 14643 14587 14525
% Nivel Cobranza 0.00% 74.76% 72.57% 72.96% 114.83% 72.48% 101.66% 95.76% 122.57% 111.47% 123.24% 67.89%
% Nivel Pérdida 0.00% 54.02% 47.64% 50.56% 51.28% 45.44% 45.58% 47.62% 52.38% 51.41% 47.89% 53.43%
Energía Suministrada (GWh) 0 3.15 2.76 3.05 3.29 3.43 3.86 4.2 4.35 4.04 3.76 3.76
Energía Facturada (GWh) 0 1.45 1.44 1.51 1.60 1.87 2.10 2.2 2.07 1.96 1.96 1.75
Energía Cobrada (GWh) 0 1.08 1.05 1.10 1.84 1.36 2.14 2.11 2.54 2.19 2.42 1.19
% Servicio 99.61% 98.44% 97.65% 99.89% 99.51% 98.11% 98.83% 98.43% 97.21% 98.85% 99.65% 98.95%
% Sin Servicio 0.39% 1.56% 2.35% 0.11% 0.49% 1.89% 1.17% 1.57% 2.79% 1.15% 0.35% 1.05%
Interrupción Programada (Hrs) 0.00 2.00 0.00 0.00 0.00 0.00 5.00 3.00 0.00 0.00 0.00 5.00
Interrupción Ejecutada (Hrs) 2.77 11.24 16.89 0.79 3.61 13.76 8.57 11.49 20.36 8.42 2.52 7.68
Promedio Interrupción Diarias (Hrs) 0.09 0.37 0.56 0.03 0.12 0.45 0.28 0.38 0.67 0.28 0.08 0.25
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Km.12 de la Sánchez, Bo. Pte. Antonio Guzmán, Bo. San Martin, Bo. Los Químicos, El Café, Villas del Café I y II, Las Casas de Canaán, Villas del Café IV y V, Colinas de Canaán, KM 12, Loma del Chivo, Bo. Paraíso, C/ Dolly, Loma del Chivo, C/ Resp. Principal, C/ 2da, C/ 18, C/ Resp. 20, Callejón Arelis de la Flor del Café.