Circuito COCO501

Distribuidora EdeSur - Provincia Peravia


Mes-Año Nov16 Oct16 Sep16 Ago16 Jul16 Jun16 May16 Abr16 Mar16 Feb16 Ene16 Dic15
Clasificación C C C C C C C C C C C C
Clientes 703 703 660 665 668 663 755 759 705 751 756 766
% Nivel Cobranza 0.00% 106.54% 152.87% 99.54% 108.00% 68.14% 87.60% 106.68% 90.01% 98.36% 87.81% 120.18%
% Nivel Pérdida 0.00% 71.61% 70.70% 72.74% 71.32% 60.89% 77.02% 66.00% 68.10% 65.77% 66.38% 70.48%
Energía Suministrada (GWh) 0 0.43 0.43 0.45 0.43 0.44 0.58 0.4 0.43 0.39 0.41 0.41
Energía Facturada (GWh) 0 0.12 0.12 0.12 0.12 0.17 0.13 0.14 0.14 0.13 0.14 0.12
Energía Cobrada (GWh) 0 0.13 0.19 0.12 0.13 0.12 0.12 0.15 0.12 0.13 0.12 0.14
% Servicio 58.41% 58.66% 60.30% 58.46% 57.25% 64.61% 87.72% 58.44% 61.19% 65.39% 62.79% 60.04%
% Sin Servicio 41.59% 41.34% 39.70% 41.54% 42.75% 35.39% 12.28% 41.56% 38.81% 34.61% 37.21% 39.96%
Interrupción Programada (Hrs) 270.00 278.99 270.00 274.00 276.99 227.00 91.00 269.00 257.00 241.99 256.99 270.00
Interrupción Ejecutada (Hrs) 303.61 301.81 289.80 303.25 312.07 258.32 89.62 303.38 283.33 252.64 271.63 291.70
Promedio Interrupción Diarias (Hrs) 9.98 9.92 9.53 9.97 10.26 8.49 2.95 9.97 9.32 8.31 8.93 9.59
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Cruce de Ocoa, Las Carreras, Los Ranchitos, Las Mayitas, Los Pilones.