Circuito COCO401

Distribuidora EdeSur - Provincia Peravia


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D A B D D D A A
Clientes 1019 1019 1014 1022 1021 1018 1020 1029 1030 1029 1020 1014
% Nivel Cobranza 0.00% 97.78% 90.12% 85.35% 92.27% 89.54% 95.78% 77.55% 71.89% 82.05% 87.84% 93.61%
% Nivel Pérdida 0.00% 65.15% 66.13% 67.08% 68.67% 68.05% 68.51% 61.97% 66.00% 62.72% 65.17% 70.68%
Energía Suministrada (GWh) 0 0.75 0.81 0.89 0.89 0.83 0.8 0.76 0.75 0.61 0.67 0.75
Energía Facturada (GWh) 0 0.26 0.27 0.29 0.28 0.26 0.25 0.29 0.25 0.23 0.23 0.22
Energía Cobrada (GWh) 0 0.26 0.25 0.25 0.26 0.24 0.24 0.22 0.18 0.19 0.21 0.21
% Servicio 96.99% 96.30% 96.22% 95.85% 97.67% 97.72% 97.48% 98.88% 95.82% 93.92% 91.87% 99.05%
% Sin Servicio 3.01% 3.70% 3.78% 4.15% 2.33% 2.28% 2.52% 1.12% 4.18% 6.08% 8.13% 0.95%
Interrupción Programada (Hrs) 11.00 22.00 11.00 3.00 7.00 12.00 7.00 0.00 9.00 18.00 43.00 6.00
Interrupción Ejecutada (Hrs) 21.96 27.01 27.56 30.29 17.00 16.61 18.36 8.17 30.54 44.37 59.34 6.95
Promedio Interrupción Diarias (Hrs) 0.72 0.89 0.91 1.00 0.56 0.55 0.60 0.27 1.00 1.46 1.95 0.23
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Cruce de Ocoa, Las Carreras, Los Ranchitos, Las Mayitas, Los Pilones.