Circuito CNP806
Distribuidora EdeEste - Provincia Distrito Nacional
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 5101 | 5042 | 5026 | 5026 | 5018 | 5001 | 5019 | 5016 | 5007 | 5016 | 5059 | 5078 |
| % Nivel Cobranza | 97.39% | 96.39% | 96.88% | 93.46% | 90.69% | 100.31% | 94.50% | 103.09% | 104.67% | 105.11% | 105.25% | 109.30% |
| % Nivel Pérdida | 15.21% | 16.91% | 21.17% | 22.41% | 21.20% | 9.62% | 19.97% | 14.51% | 20.91% | 12.76% | 16.97% | 16.19% |
| Energía Suministrada (GWh) | 4.10 | 4.23 | 4.23 | 3.98 | 3.76 | 2.85 | 3.12 | 2.83 | 3.00 | 3.22 | 3.41 | 3.78 |
| Energía Facturada (GWh) | 3.48 | 3.51 | 3.34 | 3.09 | 2.96 | 2.58 | 2.50 | 2.42 | 2.38 | 2.81 | 2.83 | 3.17 |
| Energía Cobrada (GWh) | 3.39 | 3.39 | 3.23 | 2.89 | 2.69 | 2.59 | 2.36 | 2.49 | 2.49 | 2.95 | 2.98 | 3.47 |
| % Servicio | 99.95% | 99.64% | 99.64% | 99.88% | 98.26% | 96.88% | 98.49% | 99.17% | 99.05% | 98.58% | 99.15% | 98.50% |
| % Sin Servicio | 0.05% | 0.36% | 0.36% | 0.12% | 1.74% | 3.12% | 1.51% | 0.83% | 0.95% | 1.42% | 0.85% | 1.50% |
| Interrupción Programada (Hrs) | 7.00 | 12.00 | 4.00 | 6.00 | 5.00 | 27.00 | 31.00 | 0.00 | 4.00 | 6.00 | 14.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 0.33 | 2.62 | 2.60 | 0.90 | 12.53 | 22.45 | 10.88 | 5.97 | 6.83 | 10.57 | 6.20 | 10.93 |
| Promedio Interrupción Diarias (Hrs) | 0.01 | 0.09 | 0.09 | 0.03 | 0.41 | 0.74 | 0.36 | 0.20 | 0.22 | 0.35 | 0.20 | 0.36 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 19/10/2026 | Ejecutada | 22:13:00 | 22:19:00 | 0.23 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 19/10/2026 | Ejecutada | 17:32:00 | 17:40:00 | 0.23 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 13/10/2026 | Ejecutada | 19:27:00 | 21:21:00 | 2.25 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 13/10/2026 | Ejecutada | 12:00:00 | 12:21:00 | 2.25 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |