Buscar Circuitos Glosario

Circuito CNP804

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1865 1865 1885 1876 1866 1870 1838 1840 1854 1848 1838 1832
% Nivel Cobranza 0.00% 85.94% 101.84% 94.12% 100.28% 113.80% 99.38% 107.36% 110.45% 99.76% 92.63% 100.81%
% Nivel Pérdida 0.00% -27.51% 1.69% -53.75% -40.90% -37.86% -32.43% -58.41% -32.28% -45.38% -32.17% -40.86%
Energía Suministrada (GWh) 0 1.51 1.64 1.10 1.07 1.12 1.40 1.16 1.54 1.48 1.62 1.41
Energía Facturada (GWh) 0 1.93 1.61 1.69 1.51 1.55 1.86 1.83 2.04 2.15 2.15 1.98
Energía Cobrada (GWh) 0 1.66 1.64 1.59 1.52 1.76 1.85 1.97 2.25 2.14 1.99 2.00
% Servicio 99.91% 99.13% 97.45% 99.65% 99.48% 98.09% 99.86% 99.17% 98.38% 99.78% 99.47% 99.76%
% Sin Servicio 0.09% 0.87% 2.55% 0.35% 0.52% 1.91% 0.14% 0.83% 1.62% 0.22% 0.53% 0.24%
Interrupción Programada (Hrs) 6.00 8.00 13.00 12.00 6.00 32.00 0.00 2.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.63 6.28 18.35 2.53 3.77 13.73 1.07 6.07 11.85 1.60 3.90 1.77
Promedio Interrupción Diarias (Hrs) 0.02 0.21 0.60 0.08 0.12 0.45 0.04 0.20 0.39 0.05 0.13 0.06
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CNP804
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.10
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CNP804
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
24/06/2026 Ejecutada 01:41:00 01:47:00 0.10 DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA
DON BOSCO, GASCUE, MIRAFLORES.