Circuito CHIV112

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B B B B B B B B A B
Clientes 9987 9987 9995 9600 10013 10013 9949 9915 9897 9814 0 9780
% Nivel Cobranza 0.00% 111.76% 94.15% 103.26% 146.80% 0.29% 101.36% 91.29% 98.01% 95.20% 89.21% 99.51%
% Nivel Pérdida 0.00% 27.78% 5.65% 14.09% 40.85% -17.49% 17.80% 15.32% 21.96% 31.64% 32.42% 21.45%
Energía Suministrada (GWh) 0 4.47 3.67 4.15 4.52 4.42 5.62 5.42 5.78 6.33 5.96 4.79
Energía Facturada (GWh) 0 3.23 3.46 3.57 2.68 5.19 4.62 4.59 4.51 4.33 4.03 3.77
Energía Cobrada (GWh) 0 3.61 3.26 3.68 3.93 0.02 4.68 4.19 4.42 4.12 3.6 3.75
% Servicio 98.93% 99.88% 99.73% 99.65% 99.72% 99.42% 98.23% 98.16% 99.77% 97.44% 0.00% 98.28%
% Sin Servicio 1.07% 0.12% 0.27% 0.35% 0.28% 0.58% 1.77% 1.84% 0.23% 2.56% 0.00% 1.72%
Interrupción Programada (Hrs) 0.00 0.00 10.00 0.00 0.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 7.79 0.86 1.96 2.58 2.05 4.23 12.92 13.45 1.70 18.67 0.00 12.56
Promedio Interrupción Diarias (Hrs) 0.26 0.03 0.06 0.08 0.07 0.14 0.42 0.44 0.06 0.61 0.00 0.41
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Rieles, Urb. Lora, Urb San Francisco, Urb. Félix Taveras, Urb. El Doral, Doral Park, Urb. Caperuza l, ll, lletapa, Urb. Silecio l, ll etapa, Urb. lasurb Nani Salazar, Urb. Espinal, Urb. Ike Piña, Urb. El Tejar, Urb. Piña, Urb. Andujar, Urb. La Fortuna, Urb. La Pradera, Urb. Mario Fdez, Urb. Terranova, Urb. Brugal, Mirador del Jaya, Urb. Neftaly l, ll, ll, Urb. Mena, Urb. Hidalgo, Urb. Campo Fdez, Urb. Lurey l, ll, Mirabel, La Guama, Entrada Colon, El Higuero, Urb. Reparto Cabrera, Palmas, Los Castellanos.