Circuito CHIV106JOY

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación C C C C C C C C C C D C
Clientes 2854 2854 2837 2819 2850 2850 2869 2862 2863 2872 0 2838
% Nivel Cobranza 0.00% 86.03% 92.52% 81.00% 89.49% 0.72% 91.92% 88.88% 92.53% 92.25% 91.39% 94.19%
% Nivel Pérdida 0.00% 65.33% 60.04% 60.49% 64.46% 60.95% 61.56% 57.10% 65.78% 47.76% -198.75% 52.51%
Energía Suministrada (GWh) 0 1.61 1.34 1.46 1.48 1.44 1.52 1.36 1.68 1.03 0.17 1.04
Energía Facturada (GWh) 0 0.56 0.54 0.58 0.53 0.56 0.58 0.58 0.58 0.54 0.5 0.49
Energía Cobrada (GWh) 0 0.48 0.5 0.47 0.47 0 0.54 0.52 0.53 0.49 0.46 0.46
% Servicio 98.88% 96.11% 99.37% 92.48% 98.26% 97.51% 97.25% 95.55% 96.79% 95.74% 0.00% 95.35%
% Sin Servicio 1.12% 3.89% 0.63% 7.52% 1.74% 2.49% 2.75% 4.45% 3.21% 4.26% 0.00% 4.65%
Interrupción Programada (Hrs) 0.00 5.00 25.00 54.00 4.00 0.00 0.00 9.00 5.00 10.00 0.00 8.00
Interrupción Ejecutada (Hrs) 8.16 28.37 4.63 54.89 12.70 18.18 20.11 32.50 23.44 31.13 0.00 33.96
Promedio Interrupción Diarias (Hrs) 0.27 0.93 0.15 1.80 0.42 0.60 0.66 1.07 0.77 1.02 0.00 1.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Paso Hondo, La Joya, Gran Parada, Guzmán, Los Bejucos, Los Ancones, Atabalero, Los Espino, El Tamarindo, Los Abolines, Los Cacaos, Las Lila, Bijao, Mirabel Adentro, Jubenal, La Yaguisa, El Guajiro, La mina, Ribera del Jaya, Paso Hondo, Las Bestias, Los Cadillos, Los Basilios,