Buscar Circuitos Glosario

Circuito CHIV105DU1

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Sep13 Ago13 Jul13 Jun13 May13 Abr13 Mar13 Feb13 Ene13 Dic12 Nov12 Oct12
Clasificación B B B B B B B B B B B B
Clientes 2435 2435 2409 2380 2361 2329 2303 2318 2305 2294 2334 2309
% Nivel Cobranza 0.00% 108.04% 92.93% 83.28% 109.58% 80.08% 97.35% 83.78% 78.82% 148.64% 95.66% 95.57%
% Nivel Pérdida 0.00% 51.82% 50.62% 53.27% 53.60% 49.42% 54.92% 44.26% 54.06% 64.88% 58.90% 60.42%
Energía Suministrada (GWh) 0 1.18 1.13 1.07 1.09 1.03 1.1 0.96 1.17 1.26 1.26 1.3
Energía Facturada (GWh) 0 0.57 0.56 0.5 0.51 0.52 0.49 0.53 0.54 0.44 0.52 0.51
Energía Cobrada (GWh) 0 0.62 0.52 0.42 0.56 0.42 0.48 0.45 0.42 0.66 0.5 0.49
% Servicio 77.59% 81.92% 81.15% 80.90% 76.34% 80.19% 81.28% 84.30% 86.46% 91.68% 82.58% 80.94%
% Sin Servicio 22.41% 18.08% 18.85% 19.10% 23.66% 19.81% 18.72% 15.70% 13.54% 8.32% 17.42% 19.06%
Interrupción Programada (Hrs) 161.92 129.00 138.00 120.00 138.00 132.00 108.00 114.00 126.00 107.00 129.00 138.00
Interrupción Ejecutada (Hrs) 163.57 132.01 137.62 139.41 172.73 144.63 136.67 114.61 98.86 60.77 127.14 139.17
Promedio Interrupción Diarias (Hrs) 5.38 4.34 4.52 4.58 5.68 4.75 4.49 3.77 3.25 2.00 4.18 4.58
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CHIV105DU1
Interrupciones Programadas 22
Interrupciones Ejecutadas 0
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CHIV105DU1
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/12/2013 Programada 18:00:00 23:00:00 11
20/12/2013 Programada 08:00:00 14:00:00 11
Calle D con Club Rotario