Circuito CHIV104

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación A A A A A A A A A A A A
Clientes 10126 10126 10114 11633 10294 10294 10247 10307 10325 11199 0 11174
% Nivel Cobranza 0.00% 95.76% 97.50% 100.96% 108.72% 1.36% 100.23% 89.99% 95.93% 94.70% 88.18% 97.64%
% Nivel Pérdida 0.00% 26.92% 12.75% 17.11% 16.77% 7.22% 18.80% 16.87% 23.69% -24.67% 13.31% 12.81%
Energía Suministrada (GWh) 0 2.9 2.36 2.6 2.58 2.7 3.45 3.32 3.58 2.39 3.25 2.95
Energía Facturada (GWh) 0 2.12 2.06 2.16 2.15 2.51 2.8 2.76 2.73 2.98 2.82 2.57
Energía Cobrada (GWh) 0 2.03 2.01 2.18 2.34 0.03 2.81 2.48 2.62 2.82 2.48 2.51
% Servicio 99.64% 99.88% 99.88% 99.65% 99.77% 99.75% 98.33% 97.98% 98.98% 99.29% 0.00% 98.44%
% Sin Servicio 0.36% 0.12% 0.12% 0.35% 0.23% 0.25% 1.67% 2.02% 1.02% 0.71% 0.00% 1.56%
Interrupción Programada (Hrs) 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.61 0.88 0.91 2.55 1.71 1.85 12.18 14.74 7.43 5.16 0.00 11.36
Promedio Interrupción Diarias (Hrs) 0.09 0.03 0.03 0.08 0.06 0.06 0.40 0.48 0.24 0.17 0.00 0.37
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Ercilia Pepín, Ensanche San Martín de Porres, Ensanche Duarte, Madrigal. Rabo de Chivo, Ventura Grullon, Urb. Jenifer, Urb. Abreu, Avenida Libertad, Hospital San Vicente de Paul, Barrio San Vicente, Rivera del Jaya, Guzman, Urb. Turin Fernadez, Villa Olimpia, Villa Palma, Minguita, Ugamba, Los Platanitos.