Circuito CHIV104

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación A A A A A A A A A A A A
Clientes 10468 10468 10439 10389 10345 10319 10292 10253 10207 10175 10126 10114
% Nivel Cobranza 0.00% 105.69% 105.23% 101.55% 90.89% 88.57% 98.62% 85.70% 96.54% 92.32% 95.76% 97.50%
% Nivel Pérdida 0.00% 19.86% 13.34% 14.67% 16.62% 25.87% 26.39% 19.21% 27.77% 16.60% 26.92% 12.75%
Energía Suministrada (GWh) 0 2.9 3 3.4 3.66 3.79 3.52 3.18 3.13 2.72 2.9 2.36
Energía Facturada (GWh) 0 2.32 2.6 2.9 3.06 2.81 2.59 2.57 2.26 2.27 2.12 2.06
Energía Cobrada (GWh) 0 2.46 2.74 2.95 2.78 2.49 2.56 2.2 2.18 2.09 2.03 2.01
% Servicio 98.89% 99.85% 98.39% 99.39% 99.02% 98.47% 99.76% 98.72% 99.15% 99.64% 99.88% 99.88%
% Sin Servicio 1.11% 0.15% 1.61% 0.61% 0.98% 1.53% 0.24% 1.28% 0.85% 0.36% 0.12% 0.12%
Interrupción Programada (Hrs) 8.00 0.00 4.00 0.00 5.00 5.00 0.00 0.00 0.00 4.00 0.00 0.00
Interrupción Ejecutada (Hrs) 7.96 1.14 11.77 4.44 7.17 11.20 1.78 9.36 6.19 2.61 0.88 0.91
Promedio Interrupción Diarias (Hrs) 0.26 0.04 0.39 0.15 0.24 0.37 0.06 0.31 0.20 0.09 0.03 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Ercilia Pepín, Ensanche San Martín de Porres, Ensanche Duarte, Madrigal. Rabo de Chivo, Ventura Grullon, Urb. Jenifer, Urb. Abreu, Avenida Libertad, Hospital San Vicente de Paul, Barrio San Vicente, Rivera del Jaya, Guzman, Urb. Turin Fernadez, Villa Olimpia, Villa Palma, Minguita, Ugamba, Los Platanitos.