Buscar Circuitos Glosario

Circuito CHIV102

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Jul21 Jun21 May21 Abr21 Mar21 Feb21 Ene21 Dic20 Nov20 Oct20 Sep20 Ago20
Clasificación A A A A A A A A A A A A
Clientes 11529 11439 11410 11350 11299 11227 11178 11111 11015 10944 10872 10808
% Nivel Cobranza 99.50% 95.05% 93.74% 93.05% 105.90% 92.61% 93.02% 116.53% 103.15% 108.21% 104.51% 111.38%
% Nivel Pérdida 22.09% 11.80% 22.70% 16.45% 17.06% 5.33% 14.02% 17.89% 2.77% 14.99% 10.58% 15.61%
Energía Suministrada (GWh) 4.88 4.35 4.54 3.93 3.75 3.35 3.68 3.76 3.76 4.48 4.45 4.68
Energía Facturada (GWh) 3.8 3.84 3.51 3.29 3.11 3.17 3.17 3.09 3.66 3.8 3.98 3.95
Energía Cobrada (GWh) 3.78 3.65 3.29 3.06 3.29 2.94 2.95 3.6 3.78 4.12 4.16 4.4
% Servicio 99.26% 98.33% 97.34% 99.35% 99.12% 99.42% 99.79% 99.77% 99.50% 99.92% 98.62% 98.92%
% Sin Servicio 0.74% 1.67% 2.66% 0.65% 0.88% 0.58% 0.21% 0.23% 0.50% 0.08% 1.38% 1.08%
Interrupción Programada (Hrs) 5.00 5.00 5.00 0.00 3.00 0.00 0.00 0.00 3.00 5.00 7.00 0.00
Interrupción Ejecutada (Hrs) 5.42 12.18 19.44 4.75 6.46 4.24 1.56 1.70 3.62 0.55 10.06 7.87
Promedio Interrupción Diarias (Hrs) 0.18 0.40 0.64 0.16 0.21 0.14 0.05 0.06 0.12 0.02 0.33 0.26
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CHIV102
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.05
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CHIV102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/07/2021 Ejecutada 19:41:00 19:44:00 0.05 DISPARO DESCONOCIDO
Los Rieles, Urb. Lora, Urb. San Francisco, Urb. Félix Taveras, Genimo, La Enea, Aguas Negras, El Pozo, Urb. Los Maestro.