Circuito CHIV101

Distribuidora EdeNorte - Provincia Duarte


Mes-Año Jul21 Jun21 May21 Abr21 Mar21 Feb21 Ene21 Dic20 Nov20 Oct20 Sep20 Ago20
Clasificación A A A A A A A A A A A A
Clientes 6640 6625 6598 6581 6563 6544 6531 6441 6455 6423 6398 6388
% Nivel Cobranza 86.90% 80.38% 96.07% 83.24% 106.50% 85.90% 91.19% 109.74% 93.26% 101.24% 96.57% 91.27%
% Nivel Pérdida 13.73% 1.29% 18.33% 7.27% 12.90% -0.59% -1.69% 6.57% -8.99% 11.47% 0.18% 4.62%
Energía Suministrada (GWh) 3.21 2.91 3.06 2.67 2.6 2.29 2.33 2.56 2.6 3.06 2.91 3.04
Energía Facturada (GWh) 2.77 2.87 2.5 2.47 2.27 2.3 2.37 2.39 2.83 2.71 2.91 2.9
Energía Cobrada (GWh) 2.41 2.31 2.4 2.06 2.41 1.98 2.16 2.63 2.64 2.74 2.81 2.64
% Servicio 98.99% 98.80% 99.14% 99.58% 99.15% 99.46% 99.80% 99.57% 99.64% 99.07% 93.28% 98.72%
% Sin Servicio 1.01% 1.20% 0.86% 0.42% 0.85% 0.54% 0.20% 0.43% 0.36% 0.93% 6.72% 1.28%
Interrupción Programada (Hrs) 5.00 8.00 5.00 0.00 3.00 0.00 0.00 0.00 3.00 0.00 17.00 0.00
Interrupción Ejecutada (Hrs) 7.35 8.78 6.31 3.10 6.21 3.91 1.49 3.14 2.63 6.78 49.02 9.36
Promedio Interrupción Diarias (Hrs) 0.24 0.29 0.21 0.10 0.20 0.13 0.05 0.10 0.09 0.22 1.61 0.31
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Zona Franca San Francisco De Macorís (Antiguo ZFSF101) Santa Ana, Los Ciruelos, El Capacito, Las Flores, Urb. Balbí, Urb. Caonabo, Urb. Almánzar, Urb. El Silencio I Y II, Urb. Caperuza I, Urb. Caperuza II, Urb. Ana Salime, Urb. Brugal, Urb. Álvarez, Las Cejas, Urb. Codero Tejada, Urb. Neftalí I II y III, Urb. El Tejar, Urb. Paseo del Río, Urb. Terranova, Mirabel, La Guama, Mirador del Jaya, Centro de la Cuidad hasta Av. La Libertad, Urb. Campo Fernández, Barrio Nuevo I, Urb. Andújar, Urb. El Dor