Circuito CHIV101
Distribuidora EdeNorte - Provincia Duarte
Mes-Año | Jul21 | Jun21 | May21 | Abr21 | Mar21 | Feb21 | Ene21 | Dic20 | Nov20 | Oct20 | Sep20 | Ago20 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
Clientes | 6640 | 6625 | 6598 | 6581 | 6563 | 6544 | 6531 | 6441 | 6455 | 6423 | 6398 | 6388 |
% Nivel Cobranza | 86.90% | 80.38% | 96.07% | 83.24% | 106.50% | 85.90% | 91.19% | 109.74% | 93.26% | 101.24% | 96.57% | 91.27% |
% Nivel Pérdida | 13.73% | 1.29% | 18.33% | 7.27% | 12.90% | -0.59% | -1.69% | 6.57% | -8.99% | 11.47% | 0.18% | 4.62% |
Energía Suministrada (GWh) | 3.21 | 2.91 | 3.06 | 2.67 | 2.6 | 2.29 | 2.33 | 2.56 | 2.6 | 3.06 | 2.91 | 3.04 |
Energía Facturada (GWh) | 2.77 | 2.87 | 2.5 | 2.47 | 2.27 | 2.3 | 2.37 | 2.39 | 2.83 | 2.71 | 2.91 | 2.9 |
Energía Cobrada (GWh) | 2.41 | 2.31 | 2.4 | 2.06 | 2.41 | 1.98 | 2.16 | 2.63 | 2.64 | 2.74 | 2.81 | 2.64 |
% Servicio | 98.99% | 98.80% | 99.14% | 99.58% | 99.15% | 99.46% | 99.80% | 99.57% | 99.64% | 99.07% | 93.28% | 98.72% |
% Sin Servicio | 1.01% | 1.20% | 0.86% | 0.42% | 0.85% | 0.54% | 0.20% | 0.43% | 0.36% | 0.93% | 6.72% | 1.28% |
Interrupción Programada (Hrs) | 5.00 | 8.00 | 5.00 | 0.00 | 3.00 | 0.00 | 0.00 | 0.00 | 3.00 | 0.00 | 17.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 7.35 | 8.78 | 6.31 | 3.10 | 6.21 | 3.91 | 1.49 | 3.14 | 2.63 | 6.78 | 49.02 | 9.36 |
Promedio Interrupción Diarias (Hrs) | 0.24 | 0.29 | 0.21 | 0.10 | 0.20 | 0.13 | 0.05 | 0.10 | 0.09 | 0.22 | 1.61 | 0.31 |
Zona Franca San Francisco De Macorís (Antiguo ZFSF101) Santa Ana, Los Ciruelos, El Capacito, Las Flores, Urb. Balbí, Urb. Caonabo, Urb. Almánzar, Urb. El Silencio I Y II, Urb. Caperuza I, Urb. Caperuza II, Urb. Ana Salime, Urb. Brugal, Urb. Álvarez, Las Cejas, Urb. Codero Tejada, Urb. Neftalí I II y III, Urb. El Tejar, Urb. Paseo del Río, Urb. Terranova, Mirabel, La Guama, Mirador del Jaya, Centro de la Cuidad hasta Av. La Libertad, Urb. Campo Fernández, Barrio Nuevo I, Urb. Andújar, Urb. El Dor