Circuito CESP104
Distribuidora EdeNorte - Provincia Valverde Mao
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 6030 | 6030 | 6014 | 6007 | 6039 | 6027 | 6013 | 6024 | 6028 | 6000 | 5962 | 5926 |
| % Nivel Cobranza | 0.00% | 103.10% | 80.17% | 106.80% | 94.60% | 91.69% | 105.15% | 93.82% | 103.51% | 98.70% | 85.61% | 88.34% |
| % Nivel Pérdida | 0.00% | 41.07% | 15.55% | 38.43% | 15.09% | 21.56% | 34.77% | 28.51% | 31.17% | 24.46% | 33.60% | 37.89% |
| Energía Suministrada (GWh) | 0 | 2.31 | 1.75 | 2.04 | 1.59 | 1.86 | 2.04 | 1.96 | 2.09 | 2.05 | 2.48 | 2.5 |
| Energía Facturada (GWh) | 0 | 1.36 | 1.47 | 1.26 | 1.35 | 1.46 | 1.33 | 1.4 | 1.44 | 1.55 | 1.64 | 1.55 |
| Energía Cobrada (GWh) | 0 | 1.41 | 1.18 | 1.34 | 1.28 | 1.34 | 1.4 | 1.32 | 1.49 | 1.53 | 1.41 | 1.37 |
| % Servicio | 98.85% | 98.00% | 97.84% | 98.64% | 96.63% | 99.52% | 99.85% | 98.09% | 97.14% | 97.31% | 96.57% | 99.32% |
| % Sin Servicio | 1.15% | 2.00% | 2.16% | 1.36% | 3.37% | 0.48% | 0.15% | 1.91% | 2.86% | 2.69% | 3.43% | 0.68% |
| Interrupción Programada (Hrs) | 13.00 | 13.00 | 6.00 | 6.00 | 0.00 | 11.00 | 0.00 | 4.00 | 16.00 | 5.00 | 23.00 | 6.00 |
| Interrupción Ejecutada (Hrs) | 8.31 | 14.43 | 15.53 | 9.77 | 24.26 | 3.44 | 1.12 | 13.95 | 20.85 | 19.67 | 25.06 | 4.99 |
| Promedio Interrupción Diarias (Hrs) | 0.27 | 0.47 | 0.51 | 0.32 | 0.80 | 0.11 | 0.04 | 0.46 | 0.69 | 0.65 | 0.82 | 0.16 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 06/07/2026 | Ejecutada | 17:04:30 | 17:39:32 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 15:44:56 | 15:48:15 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 13:07:18 | 13:33:09 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 12:31:46 | 12:58:11 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 11:52:48 | 12:12:26 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 11:34:47 | 11:40:46 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 06/07/2026 | Ejecutada | 11:21:31 | 11:26:34 | 2.02 | ARBOLES Y RAMA SOBRE LINEA // CAUSA DESCONOCIDA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 14:20:54 | 14:25:16 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 12:47:03 | 13:02:23 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 12:31:21 | 12:39:53 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 11:24:22 | 11:38:49 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 11:12:22 | 11:20:20 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 10:46:00 | 10:50:24 | 0.92 | ARBOLES Y RAMA SOBRE LINEA // DISPARO DESCONOCIDO |
| 04/07/2026 | Ejecutada | 15:13:50 | 15:18:17 | 0.07 | DISPARO DESCONOCIDO |
| 03/07/2026 | Ejecutada | 12:28:02 | 12:31:21 | 0.06 | DESARROLLO DE OBRAS |
| 02/07/2026 | Ejecutada | 21:21:09 | 23:48:50 | 3.34 | APERTURA DE LINEA DE TRANSMISION // APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 02/07/2026 | Ejecutada | 18:29:06 | 19:06:35 | 3.34 | APERTURA DE LINEA DE TRANSMISION // APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 02/07/2026 | Ejecutada | 17:09:38 | 17:24:44 | 3.34 | APERTURA DE LINEA DE TRANSMISION // APERTURA POR PROXIMIDAD CON OTRO CIRCUITO // FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 01/07/2026 | Ejecutada | 12:25:31 | 12:30:45 | 0.09 | DESARROLLO DE OBRAS |
| 30/06/2026 | Programada | 10:00:00 | 16:00:00 | 6 | PODA PREVENTIVO |
| 30/06/2026 | Ejecutada | 16:11:40 | 16:14:55 | 0.14 | PODA PREVENTIVO |
| 30/06/2026 | Ejecutada | 09:59:14 | 10:04:30 | 0.14 | PODA PREVENTIVO |
| 29/06/2026 | Ejecutada | 17:23:56 | 17:28:00 | 0.07 | DESARROLLO DE OBRAS |