Buscar Circuitos Glosario

Circuito CESP103JIC

Distribuidora EdeNorte - Provincia Dajabon


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación D D D D D D D D D D D D
Clientes 1252 1252 1252 1252 12161 12161 1261 1261 1261 1261 1261 1261
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
% Servicio 98.99% 97.68% 96.85% 97.89% 98.82% 98.62% 98.78% 95.57% 99.65% 99.97% 98.02% 96.40%
% Sin Servicio 1.01% 2.32% 3.15% 2.11% 1.18% 1.38% 1.22% 4.43% 0.35% 0.03% 1.98% 3.60%
Interrupción Programada (Hrs) 4.00 0.00 13.00 19.00 0.00 6.00 6.00 11.00 0.00 0.00 0.00 11.00
Interrupción Ejecutada (Hrs) 7.26 16.67 22.69 15.21 8.52 9.95 8.78 31.92 2.51 0.19 14.45 26.25
Promedio Interrupción Diarias (Hrs) 0.24 0.55 0.75 0.50 0.28 0.33 0.29 1.05 0.08 0.01 0.48 0.86
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CESP103JIC
Interrupciones Programadas 0
Interrupciones Ejecutadas 21.47
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CESP103JIC
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/10/2026 Ejecutada 15:39:00 21:54:46 7.13 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLO EN PT S/E
20/10/2026 Ejecutada 15:17:12 15:39:00 7.13 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLO EN PT S/E
20/10/2026 Ejecutada 08:41:09 09:11:07 7.13 FALLAS ETED, DISPARO DE LINEA TRANSMISION // FALLO EN PT S/E
13/10/2026 Ejecutada 07:58:16 08:02:51 0.08 DISPARO DESCONOCIDO
Cruce de Esperanza parcial, Chequeo, Factoria Peña Alba, Jicome, Los Rincones, Ojo de Agua, Damajagua