Circuito CESP103
Distribuidora EdeNorte - Provincia Valverde Mao
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 9384 | 9384 | 9331 | 9302 | 10484 | 10439 | 10442 | 10418 | 10382 | 9103 | 9068 | 9030 |
| % Nivel Cobranza | 0.00% | 84.82% | 81.93% | 108.31% | 94.64% | 98.74% | 102.09% | 98.06% | 94.22% | 106.34% | 78.13% | 98.84% |
| % Nivel Pérdida | 0.00% | 23.37% | 19.42% | 33.35% | -1.48% | 9.82% | 11.57% | 11.89% | 15.53% | 1.59% | 2.22% | 24.36% |
| Energía Suministrada (GWh) | 0 | 3.17 | 2.68 | 2.65 | 2.17 | 2.53 | 2.78 | 2.85 | 3.06 | 2.59 | 2.74 | 2.89 |
| Energía Facturada (GWh) | 0 | 2.43 | 2.16 | 1.77 | 2.2 | 2.28 | 2.45 | 2.51 | 2.58 | 2.54 | 2.68 | 2.19 |
| Energía Cobrada (GWh) | 0 | 2.06 | 1.77 | 1.91 | 2.08 | 2.25 | 2.51 | 2.46 | 2.43 | 2.71 | 2.09 | 2.16 |
| % Servicio | 98.86% | 99.76% | 99.05% | 99.06% | 97.49% | 99.81% | 100.00% | 98.11% | 98.37% | 99.33% | 98.91% | 99.54% |
| % Sin Servicio | 1.14% | 0.24% | 0.95% | 0.94% | 2.51% | 0.19% | 0.00% | 1.89% | 1.63% | 0.67% | 1.09% | 0.46% |
| Interrupción Programada (Hrs) | 7.00 | 0.00 | 6.00 | 6.00 | 0.00 | 0.00 | 0.00 | 0.00 | 11.00 | 0.00 | 18.00 | 4.00 |
| Interrupción Ejecutada (Hrs) | 8.19 | 1.71 | 6.83 | 6.78 | 18.10 | 1.35 | 0.00 | 13.80 | 11.91 | 4.86 | 7.98 | 3.37 |
| Promedio Interrupción Diarias (Hrs) | 0.27 | 0.06 | 0.22 | 0.22 | 0.60 | 0.04 | 0.00 | 0.45 | 0.39 | 0.16 | 0.26 | 0.11 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 06/07/2026 | Ejecutada | 18:04:34 | 18:09:14 | 0.08 | DISPARO DESCONOCIDO |
| 05/07/2026 | Ejecutada | 18:01:02 | 18:04:48 | 0.06 | DISPARO DESCONOCIDO |
| 03/07/2026 | Ejecutada | 00:00:00 | 00:13:44 | 0.23 | APERTURA DE LINEA DE TRANSMISION |
| 02/07/2026 | Programada | 10:00:00 | 15:00:00 | 5 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 23:51:23 | 23:59:59 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 21:21:43 | 23:48:45 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 16:52:15 | 20:54:06 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 16:48:44 | 16:52:15 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 16:41:36 | 16:48:43 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 02/07/2026 | Ejecutada | 10:36:00 | 15:38:31 | 11.85 | APERTURA DE LINEA DE TRANSMISION // PODA PREVENTIVO // POSTE ROTO |
| 30/06/2026 | Ejecutada | 12:01:43 | 12:06:51 | 0.09 | DISPARO DESCONOCIDO |