Circuito CESP103

Distribuidora EdeNorte - Provincia Valverde Mao


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación A A A A A A A A A A A A
Clientes 9023 9019 9353 9002 9002 8996 8979 8956 8900 0 8975 8974
% Nivel Cobranza 97.96% 94.63% 91.13% 115.47% 1.57% 99.39% 91.09% 89.21% 95.35% 96.79% 88.72% 93.07%
% Nivel Pérdida 21.21% -1.66% 3.83% 9.43% 1.61% 6.70% 9.95% 10.51% 20.84% 10.97% 7.04% 5.27%
Energía Suministrada (GWh) 2.31 1.8 1.97 2.11 2.13 2.58 2.6 2.72 2.76 2.39 2.34 2.27
Energía Facturada (GWh) 1.82 1.83 1.9 1.91 2.09 2.41 2.34 2.44 2.18 2.13 2.17 2.15
Energía Cobrada (GWh) 1.78 1.74 1.73 2.21 0.03 2.39 2.14 2.17 2.08 2.06 1.93 2
% Servicio 98.86% 99.65% 99.13% 99.30% 99.22% 97.88% 98.04% 98.45% 98.64% 0.00% 99.21% 98.58%
% Sin Servicio 1.14% 0.35% 0.87% 0.70% 0.78% 2.12% 1.96% 1.55% 1.36% 0.00% 0.79% 1.42%
Interrupción Programada (Hrs) 5.00 0.00 6.00 4.00 4.00 0.00 11.00 5.00 5.00 0.00 5.00 10.00
Interrupción Ejecutada (Hrs) 8.29 2.53 6.34 5.14 5.72 15.50 14.29 11.35 9.90 0.00 5.74 10.33
Promedio Interrupción Diarias (Hrs) 0.27 0.08 0.21 0.17 0.19 0.51 0.47 0.37 0.33 0.00 0.19 0.34
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro de Esperanza parcial (Calle María Trinidad Sánchez, Barrio Norte, Invi SEA, Barrio Sur), Barrio José Clase, Barrio El Cruce, Factoría Peña Alba, Factoría Kelisa, TABADOM, Barrio Nuevo, Cañeo, Barrio El Paraiso, Barrio San Miguel y Barrio El Eden, Callejon de Monguita (Esperanza) Jicome, Hospital José Fco. Peña Gómez