Circuito CESP101
Distribuidora EdeNorte - Provincia Valverde Mao
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 7988 | 7988 | 7995 | 7967 | 6771 | 6759 | 6742 | 6714 | 6730 | 6724 | 6710 | 6705 |
| % Nivel Cobranza | 0.00% | 85.44% | 81.69% | 110.59% | 91.55% | 98.46% | 101.08% | 101.01% | 97.81% | 91.38% | 87.31% | 99.06% |
| % Nivel Pérdida | 0.00% | 24.98% | 16.64% | 23.26% | 15.72% | 27.06% | 30.70% | 29.59% | 28.12% | 29.53% | 33.46% | 35.69% |
| Energía Suministrada (GWh) | 0 | 2.29 | 1.85 | 1.84 | 1.6 | 1.9 | 2.05 | 2.03 | 2.19 | 2.3 | 2.4 | 2.43 |
| Energía Facturada (GWh) | 0 | 1.72 | 1.54 | 1.41 | 1.35 | 1.39 | 1.42 | 1.43 | 1.58 | 1.62 | 1.59 | 1.56 |
| Energía Cobrada (GWh) | 0 | 1.47 | 1.26 | 1.56 | 1.23 | 1.37 | 1.43 | 1.45 | 1.54 | 1.48 | 1.39 | 1.55 |
| % Servicio | 99.13% | 99.84% | 98.60% | 99.03% | 97.65% | 99.74% | 99.97% | 98.34% | 98.34% | 99.52% | 96.88% | 99.17% |
| % Sin Servicio | 0.87% | 0.16% | 1.40% | 0.97% | 2.35% | 0.26% | 0.03% | 1.66% | 1.66% | 0.48% | 3.12% | 0.83% |
| Interrupción Programada (Hrs) | 12.00 | 2.00 | 6.00 | 6.00 | 0.00 | 6.00 | 0.00 | 4.00 | 11.00 | 0.00 | 18.00 | 6.00 |
| Interrupción Ejecutada (Hrs) | 6.30 | 1.12 | 10.08 | 7.00 | 16.93 | 1.85 | 0.21 | 12.13 | 12.14 | 3.52 | 22.76 | 6.05 |
| Promedio Interrupción Diarias (Hrs) | 0.21 | 0.04 | 0.33 | 0.23 | 0.56 | 0.06 | 0.01 | 0.40 | 0.40 | 0.12 | 0.75 | 0.20 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 06/07/2026 | Ejecutada | 06:31:34 | 06:34:56 | 0.06 | DISPARO DESCONOCIDO |
| 03/07/2026 | Ejecutada | 21:18:49 | 21:27:48 | 0.15 | CORRECTIVO EN FUSIBLE |
| 02/07/2026 | Programada | 10:00:00 | 15:00:00 | 5 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PODA PREVENTIVO |
| 02/07/2026 | Ejecutada | 21:21:00 | 23:48:23 | 7.81 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PODA PREVENTIVO |
| 02/07/2026 | Ejecutada | 17:06:58 | 17:24:28 | 7.81 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PODA PREVENTIVO |
| 02/07/2026 | Ejecutada | 10:34:37 | 15:38:15 | 7.81 | APERTURA DE LINEA DE TRANSMISION // FALLAS ETED, DISPARO DE LINEA TRANSMISION // PODA PREVENTIVO |
| 01/07/2026 | Ejecutada | 06:06:52 | 06:14:43 | 0.13 | DISPARO DESCONOCIDO |