Circuito CENO101

Distribuidora EdeNorte - Provincia Duarte


Mes-Año May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24
Clasificación D D D D D D D D D D D D
Clientes 1649 1649 1647 1658 1643 1675 1675 1683 1699 1698 1683 0
% Nivel Cobranza 0.00% 96.83% 99.66% 85.82% 115.06% 99.18% 1.12% 94.58% 108.01% 97.00% 97.28% 87.03%
% Nivel Pérdida 0.00% 65.07% 69.07% 57.53% 61.81% 66.20% 61.08% 68.42% 72.77% 68.00% 68.02% 67.66%
Energía Suministrada (GWh) 0 0.84 0.92 0.71 0.74 0.83 0.82 1.06 1.01 1.06 1.01 0.97
Energía Facturada (GWh) 0 0.29 0.28 0.3 0.28 0.28 0.32 0.33 0.28 0.34 0.32 0.31
Energía Cobrada (GWh) 0 0.29 0.28 0.26 0.32 0.28 0 0.32 0.3 0.33 0.31 0.27
% Servicio 98.99% 99.10% 98.04% 95.77% 87.21% 99.13% 98.81% 97.63% 96.88% 98.85% 97.41% 0.00%
% Sin Servicio 1.01% 0.90% 1.96% 4.23% 12.79% 0.87% 1.19% 2.37% 3.12% 1.15% 2.59% 0.00%
Interrupción Programada (Hrs) 4.00 0.00 5.00 30.00 84.00 4.00 6.00 0.00 4.00 4.00 0.00 0.00
Interrupción Ejecutada (Hrs) 7.34 6.56 14.31 30.86 93.34 6.37 8.67 17.29 22.74 8.36 18.92 0.00
Promedio Interrupción Diarias (Hrs) 0.24 0.22 0.47 1.01 3.07 0.21 0.29 0.57 0.75 0.27 0.62 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Indios, Las Cruces de cenovi, El Canal, El Mamey, Santa Ana, Porquero, Chucho de Per, La Rosa, El Caimito, Rancho Viejo, Arenoso de Santa Ana, Callejon Lo Mena.