Buscar Circuitos Glosario

Circuito CCIB101

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Jun26 May26 Abr26 Mar26 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 0 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 100.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% -12.78% 19.79% -9.41% 0.09% 1.90% 1.32% -1.47%
Energía Suministrada (GWh) 0 0 0 0 0 7.5 8.45 6.78 7.42 7.41 7.27 7.18
Energía Facturada (GWh) 0 0 0 0 7.5 8.45 6.78 7.42 7.41 7.27 7.18 7.28
Energía Cobrada (GWh) 0 0 0 0 0 8.45 6.78 7.42 7.41 7.27 0 7.28
% Servicio 100.00% 100.00% 100.00% 100.00% 0.00% 99.56% 100.00% 100.00% 100.00% 100.00% 98.70% 99.88%
% Sin Servicio 0.00% 0.00% 0.00% 0.00% 0.00% 0.44% 0.00% 0.00% 0.00% 0.00% 1.30% 0.12%
Interrupción Programada (Hrs) 0.00 6.00 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.00 0.00 0.00 0.00 0.00 3.23 0.00 0.00 0.00 0.00 9.52 0.90
Promedio Interrupción Diarias (Hrs) 0.00 0.00 0.00 0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.31 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CCIB101
Interrupciones Programadas 0
Interrupciones Ejecutadas 5.06
% Ejecución Operativa 0%
Detalle de Salidas - Circuito CCIB101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 09:58:21 15:02:01 5.06 APERTURA DE LINEA DE TRANSMISION
Cemento Cibao