Buscar Circuitos Glosario

Circuito CAPO06

Distribuidora EdeEste - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 5764 5954 5845 5845 5844 5745 5869 5757 5808 5903 5919 6256
% Nivel Cobranza 99.83% 84.60% 93.09% 92.39% 77.78% 86.17% 99.75% 87.58% 103.28% 102.58% 97.35% 105.19%
% Nivel Pérdida 41.30% 39.92% 44.91% 41.31% 40.17% 38.44% 38.63% 28.53% 32.16% 33.69% 31.27% 32.09%
Energía Suministrada (GWh) 2.68 2.89 2.83 2.63 2.52 2.10 1.99 1.78 1.95 2.09 2.14 2.44
Energía Facturada (GWh) 1.57 1.74 1.56 1.54 1.51 1.29 1.22 1.28 1.33 1.39 1.47 1.66
Energía Cobrada (GWh) 1.57 1.47 1.45 1.43 1.17 1.11 1.22 1.12 1.37 1.42 1.43 1.75
% Servicio 96.85% 98.69% 99.02% 98.81% 98.66% 97.72% 98.38% 97.84% 99.62% 99.15% 98.01% 98.61%
% Sin Servicio 3.15% 1.31% 0.98% 1.19% 1.34% 2.28% 1.62% 2.16% 0.38% 0.85% 1.99% 1.39%
Interrupción Programada (Hrs) 34.00 14.00 6.00 30.00 6.00 18.00 24.00 9.00 4.00 6.00 0.00 0.00
Interrupción Ejecutada (Hrs) 22.65 9.45 7.07 8.57 9.67 16.43 11.68 15.52 2.72 6.33 14.52 10.15
Promedio Interrupción Diarias (Hrs) 0.74 0.31 0.23 0.28 0.32 0.54 0.38 0.51 0.09 0.21 0.48 0.33
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CAPO06
Interrupciones Programadas 8.00
Interrupciones Ejecutadas 8.15
% Ejecución Operativa 101.88%
Detalle de Salidas - Circuito CAPO06
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/10/2026 Ejecutada 15:48:00 15:53:00 0.08 DISTRIBUCION (DISPARO/AVERIAS) - FALLA DE COMUNICACION DEL EQUIPO
09/10/2026 Programada 09:20:00 17:20:00 8.00 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
09/10/2026 Ejecutada 09:23:00 17:17:00 7.90 DISTRIBUCION (PROYECTOS) - CONSTRUCCION DE LINEA MT
08/10/2026 Ejecutada 18:34:00 18:44:00 0.17 DISTRIBUCION (DISPARO/AVERIAS) - FALLOS EN TRANSFORMADOR
ENSANCHE CAPOTILLO, ENSANCHE LUPERON, VILLA JUANA, VILLAS AGRICOLAS.