Circuito CALB101A
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Feb17 | Ene17 | Dic16 | Nov16 | Oct16 | Sep16 | Ago16 | Jul16 | Jun16 | May16 | Abr16 | Mar16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 350 | 317 | 317 | 318 | 316 | 313 | 317 | 321 | 318 | 318 | 318 | 323 |
| % Nivel Cobranza | 0.00% | 0.00% | 110.33% | 86.80% | 104.49% | 91.98% | 97.63% | 113.14% | 84.28% | 121.26% | 121.26% | 96.25% |
| % Nivel Pérdida | 0.00% | 0.00% | 35.22% | 38.85% | 38.49% | 34.60% | 42.99% | 46.07% | 34.72% | 37.63% | 23.97% | 20.83% |
| Energía Suministrada (GWh) | 0 | 0 | 0.12 | 0.13 | 0.11 | 0.12 | 0.12 | 0.13 | 0.12 | 0.13 | 0.11 | 0.1 |
| Energía Facturada (GWh) | 0 | 0 | 0.08 | 0.08 | 0.07 | 0.08 | 0.07 | 0.07 | 0.08 | 0.08 | 0.08 | 0.08 |
| Energía Cobrada (GWh) | 0 | 0 | 0.08 | 0.07 | 0.07 | 0.07 | 0.07 | 0.08 | 0.06 | 0.1 | 0.1 | 0.08 |
| % Servicio | 99.32% | 100.00% | 100.00% | 100.00% | 90.86% | 79.47% | 83.98% | 79.10% | 83.78% | 91.00% | 76.45% | 78.92% |
| % Sin Servicio | 0.68% | 0.00% | 0.00% | 0.00% | 9.14% | 20.53% | 16.02% | 20.90% | 16.22% | 9.00% | 23.55% | 21.08% |
| Interrupción Programada (Hrs) | 139.00 | 139.00 | 145.00 | 136.00 | 145.00 | 142.00 | 148.00 | 136.00 | 111.00 | 54.00 | 142.00 | 145.00 |
| Interrupción Ejecutada (Hrs) | 5.00 | 0.00 | 0.00 | 0.00 | 66.71 | 149.87 | 116.92 | 152.55 | 118.42 | 65.73 | 171.88 | 153.88 |
| Promedio Interrupción Diarias (Hrs) | 0.16 | 0.00 | 0.00 | 0.00 | 2.19 | 4.93 | 3.84 | 5.02 | 3.89 | 2.16 | 5.65 | 5.06 |
Carretera Salina, Salina de Baní.