Circuito CALB101
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | A | B | C | C | C |
| Clientes | 434 | 432 | 432 | 431 | 431 | 428 | 431 | 427 | 424 | 425 | 423 | 427 |
| % Nivel Cobranza | 0.00% | 0.00% | 101.30% | 102.24% | 105.74% | 94.38% | 96.16% | 98.10% | 100.74% | 95.79% | 89.60% | 117.88% |
| % Nivel Pérdida | 0.00% | 0.00% | 39.98% | 41.29% | 40.86% | 39.20% | 61.37% | 58.45% | 59.68% | 59.66% | 58.03% | 55.65% |
| Energía Suministrada (GWh) | 0 | 0 | 0.46 | 0.50 | 0.5 | 0.55 | 0.55 | 0.49 | 0.5 | 0.47 | 0.45 | 0.37 |
| Energía Facturada (GWh) | 0 | 0 | 0.28 | 0.29 | 0.29 | 0.33 | 0.21 | 0.2 | 0.2 | 0.19 | 0.19 | 0.16 |
| Energía Cobrada (GWh) | 0 | 0 | 0.28 | 0.3 | 0.31 | 0.32 | 0.21 | 0.2 | 0.2 | 0.18 | 0.17 | 0.19 |
| % Servicio | 97.85% | 95.40% | 98.26% | 97.72% | 95.76% | 96.55% | 95.45% | 95.91% | 95.73% | 96.12% | 97.66% | 93.05% |
| % Sin Servicio | 2.15% | 4.60% | 1.74% | 2.28% | 4.24% | 3.45% | 4.55% | 4.09% | 4.27% | 3.88% | 2.34% | 6.95% |
| Interrupción Programada (Hrs) | 11.00 | 8.00 | 3.00 | 4.00 | 16.00 | 8.00 | 11.00 | 16.00 | 19.00 | 3.00 | 9.00 | 25.00 |
| Interrupción Ejecutada (Hrs) | 15.51 | 34.19 | 12.69 | 16.66 | 30.92 | 25.20 | 33.18 | 29.86 | 31.20 | 28.30 | 17.06 | 50.73 |
| Promedio Interrupción Diarias (Hrs) | 0.51 | 1.12 | 0.42 | 0.55 | 1.02 | 0.83 | 1.09 | 0.98 | 1.03 | 0.93 | 0.56 | 1.67 |
Base Naval Las Calderas, El Dique, Carretera Salinas, Salinas de Baní.