Circuito CALB101
Distribuidora EdeSur - Provincia Peravia
| Mes-Año | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | C | C | A | B | C |
| Clientes | 432 | 432 | 432 | 432 | 432 | 431 | 431 | 428 | 431 | 427 | 424 | 425 |
| % Nivel Cobranza | 0.00% | 91.36% | 101.49% | 103.09% | 101.30% | 102.24% | 105.74% | 94.38% | 96.16% | 98.10% | 100.74% | 95.79% |
| % Nivel Pérdida | 0.00% | 26.59% | 44.34% | 41.43% | 39.98% | 41.29% | 40.86% | 39.20% | 61.37% | 58.45% | 59.68% | 59.66% |
| Energía Suministrada (GWh) | 0 | 0.39 | 0.45 | 0.45 | 0.46 | 0.50 | 0.5 | 0.55 | 0.55 | 0.49 | 0.5 | 0.47 |
| Energía Facturada (GWh) | 0 | 0.28 | 0.25 | 0.26 | 0.28 | 0.29 | 0.29 | 0.33 | 0.21 | 0.2 | 0.2 | 0.19 |
| Energía Cobrada (GWh) | 0 | 0.26 | 0.26 | 0.27 | 0.28 | 0.3 | 0.31 | 0.32 | 0.21 | 0.2 | 0.2 | 0.18 |
| % Servicio | 96.97% | 96.95% | 97.85% | 95.40% | 98.26% | 97.72% | 95.76% | 96.55% | 95.45% | 95.91% | 95.73% | 96.12% |
| % Sin Servicio | 3.03% | 3.05% | 2.15% | 4.60% | 1.74% | 2.28% | 4.24% | 3.45% | 4.55% | 4.09% | 4.27% | 3.88% |
| Interrupción Programada (Hrs) | 15.00 | 12.00 | 11.00 | 8.00 | 3.00 | 4.00 | 16.00 | 8.00 | 11.00 | 16.00 | 19.00 | 3.00 |
| Interrupción Ejecutada (Hrs) | 21.84 | 21.94 | 15.51 | 34.19 | 12.69 | 16.66 | 30.92 | 25.20 | 33.18 | 29.86 | 31.20 | 28.30 |
| Promedio Interrupción Diarias (Hrs) | 0.72 | 0.72 | 0.51 | 1.12 | 0.42 | 0.55 | 1.02 | 0.83 | 1.09 | 0.98 | 1.03 | 0.93 |
Base Naval Las Calderas, El Dique, Carretera Salinas, Salinas de Baní.