Buscar Circuitos Glosario

Circuito CABT102

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación B B B B B B B B B B B B
Clientes 3692 3692 3658 3658 3650 3641 3629 3635 3618 3619 3593 3582
% Nivel Cobranza 0.00% 85.69% 97.78% 89.83% 91.71% 83.13% 110.90% 96.38% 96.30% 106.44% 106.38% 104.67%
% Nivel Pérdida 0.00% 10.20% 15.49% 9.42% 17.13% 6.50% 20.76% -4.79% 11.03% 17.74% 14.38% 16.41%
Energía Suministrada (GWh) 0 1.03 0.97 0.92 0.89 0.76 0.75 0.61 0.73 0.77 0.79 0.92
Energía Facturada (GWh) 0 0.92 0.82 0.83 0.74 0.71 0.59 0.64 0.65 0.64 0.68 0.77
Energía Cobrada (GWh) 0 0.79 0.8 0.75 0.68 0.59 0.66 0.61 0.62 0.68 0.72 0.8
% Servicio 99.26% 99.29% 96.19% 96.71% 98.96% 97.77% 97.63% 97.68% 98.74% 98.69% 96.00% 98.57%
% Sin Servicio 0.74% 0.71% 3.81% 3.29% 1.04% 2.23% 2.38% 2.33% 1.26% 1.31% 4.00% 1.43%
Interrupción Programada (Hrs) 8.00 0.00 16.00 11.00 5.00 5.00 10.00 5.00 4.00 1.00 21.00 5.00
Interrupción Ejecutada (Hrs) 5.35 5.14 27.43 23.66 7.47 16.05 17.10 16.74 9.07 9.74 29.21 10.42
Promedio Interrupción Diarias (Hrs) 0.18 0.17 0.90 0.78 0.25 0.53 0.56 0.55 0.30 0.32 0.96 0.34
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CABT102
Interrupciones Programadas 8
Interrupciones Ejecutadas 8.51
% Ejecución Operativa 106.38%
Detalle de Salidas - Circuito CABT102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Programada 09:00:00 17:00:00 8 FACILITAR TRABAJOS EMPRESA TRANSMISION
22/10/2026 Ejecutada 09:22:58 17:53:33 8.51 FACILITAR TRABAJOS EMPRESA TRANSMISION
La Colonia, Callejón de La Loma y La Ciénaga, Costa Azul, El Rocon, Barrio La Paz.