Buscar Circuitos Glosario

Circuito CABA102

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 3305 3305 836 836 757 744 735 750 941 938 938 949
% Nivel Cobranza 0.00% 116.23% 77.62% 88.11% 88.21% 81.77% 132.29% 123.64% 73.66% 103.00% 86.44% 108.64%
% Nivel Pérdida 0.00% 59.28% 48.28% 48.17% 51.32% 51.75% 49.85% 34.86% 24.89% 21.67% 41.26% 35.56%
Energía Suministrada (GWh) 0 3.60 3.44 2.43 1.63 1.48 1.53 1.38 1.57 2.57 2.67 1.95
Energía Facturada (GWh) 0 1.47 1.78 1.26 0.79 0.72 0.77 0.90 1.18 2.01 1.57 1.26
Energía Cobrada (GWh) 0 1.70 1.38 1.11 0.70 0.58 1.02 1.11 0.87 2.07 1.36 1.37
% Servicio 98.88% 98.92% 97.34% 97.89% 98.44% 98.44% 99.26% 98.31% 99.12% 99.03% 97.89% 98.16%
% Sin Servicio 1.12% 1.08% 2.66% 2.11% 1.56% 1.56% 0.74% 1.69% 0.88% 0.97% 2.11% 1.84%
Interrupción Programada (Hrs) 3.00 0.00 6.00 1.00 3.00 3.00 1.00 1.00 0.00 0.00 0.00 6.00
Interrupción Ejecutada (Hrs) 8.10 7.79 19.17 15.19 11.25 11.25 5.36 12.18 6.32 7.21 15.43 13.42
Promedio Interrupción Diarias (Hrs) 0.27 0.26 0.63 0.50 0.37 0.37 0.18 0.40 0.21 0.24 0.51 0.44
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito CABA102
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 11.25
% Ejecución Operativa 281.25%
Detalle de Salidas - Circuito CABA102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
17/10/2026 Programada 09:00:00 13:00:00 4.00 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
17/10/2026 Ejecutada 10:24:54 15:43:56 5.60 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
17/10/2026 Ejecutada 09:30:32 09:47:13 5.60 MANTENIMIENTO ETED // MANTENIMIENTO ETED //
10/10/2026 Ejecutada 14:17:15 14:20:14 0.05 FALLA TRANSITORIA //
Santa Rosa, Campo de pozos de Lechería, Campo de pozos de Hato Nuevo, Tinflex, FRAGASA, Genyux Plastics SRL.