Circuito CABA101
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | D | A | A | A | A | A | A | A | A | A | A |
Clientes | 6735 | 6731 | 6712 | 6677 | 6645 | 6617 | 6586 | 6524 | 1884 | 1836 | 1830 | 1813 |
% Nivel Cobranza | 124.89% | 92.63% | 104.99% | 103.11% | 58.61% | 96.48% | 82.54% | 87.54% | 95.02% | 95.84% | 97.35% | 90.50% |
% Nivel Pérdida | 67.08% | 56.01% | 63.40% | 62.28% | 56.01% | 65.27% | 58.07% | 60.56% | 63.54% | 63.70% | 64.10% | 60.08% |
Energía Suministrada (GWh) | 2.15 | 1.7 | 1.83 | 1.99 | 1.86 | 2.27 | 2.19 | 2.31 | 2.16 | 2.12 | 2.07 | 1.88 |
Energía Facturada (GWh) | 0.71 | 0.75 | 0.67 | 0.75 | 0.82 | 0.79 | 0.92 | 0.91 | 0.79 | 0.77 | 0.74 | 0.75 |
Energía Cobrada (GWh) | 0.88 | 0.69 | 0.7 | 0.77 | 0.48 | 0.76 | 0.76 | 0.8 | 0.75 | 0.74 | 0.72 | 0.68 |
% Servicio | 98.54% | 96.22% | 91.94% | 98.81% | 97.94% | 98.61% | 98.00% | 98.39% | 97.60% | 99.07% | 99.01% | 98.75% |
% Sin Servicio | 1.46% | 3.78% | 8.06% | 1.19% | 2.06% | 1.39% | 2.00% | 1.61% | 2.40% | 0.93% | 0.99% | 1.25% |
Interrupción Programada (Hrs) | 0.00 | 18.00 | 40.00 | 4.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 8.00 |
Interrupción Ejecutada (Hrs) | 10.65 | 27.61 | 58.85 | 8.67 | 15.01 | 10.13 | 14.58 | 11.72 | 17.49 | 6.76 | 7.25 | 9.15 |
Promedio Interrupción Diarias (Hrs) | 0.35 | 0.91 | 1.93 | 0.28 | 0.49 | 0.33 | 0.48 | 0.39 | 0.57 | 0.22 | 0.24 | 0.30 |
Caballona, Villa Colina, Palave, Batey Lechería, Bo. Nuevo, Bo. Las Colinas, Resid. Nueva Esperanza, Barrio Los Coroneles, Pozos de Lechería, Colinas Ranch.