Circuito BPER113JUA
Distribuidora EdeNorte - Provincia Monseñor Nouel
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 |
|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B |
| Clientes | 1221 | 1221 | 1221 | 1221 | 1221 | 1221 | 1221 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 95.87% | 97.67% | 98.47% | 98.14% | 98.84% | 96.74% | 99.71% |
| % Sin Servicio | 4.13% | 2.33% | 1.53% | 1.86% | 1.16% | 3.26% | 0.29% |
| Interrupción Programada (Hrs) | 10.00 | 10.00 | 0.00 | 0.00 | 2.00 | 20.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 29.73 | 16.79 | 11.01 | 13.37 | 8.32 | 23.45 | 2.12 |
| Promedio Interrupción Diarias (Hrs) | 0.98 | 0.55 | 0.36 | 0.44 | 0.27 | 0.77 | 0.07 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 22/10/2026 | Ejecutada | 13:22:12 | 13:32:23 | 0.17 | APERTURA DE JUMPER DE LINEA |
| 20/10/2026 | Programada | 08:00:00 | 13:00:00 | 5 | APERTURA DE LINEA DE TRANSMISION |
| 20/10/2026 | Ejecutada | 07:32:54 | 13:25:23 | 5.88 | APERTURA DE LINEA DE TRANSMISION |
| 18/10/2026 | Ejecutada | 15:21:21 | 15:26:52 | 0.16 | DISPARO DESCONOCIDO |
| 18/10/2026 | Ejecutada | 07:25:09 | 07:29:25 | 0.16 | DISPARO DESCONOCIDO |
| 17/10/2026 | Ejecutada | 23:16:30 | 23:19:32 | 0.05 | CORRECTIVO EN CONDUCTOR SECUNDARIO |
| 15/10/2026 | Ejecutada | 16:37:40 | 16:45:03 | 0.23 | DISPARO DESCONOCIDO |
| 15/10/2026 | Ejecutada | 15:56:48 | 16:02:55 | 0.23 | DISPARO DESCONOCIDO |