Circuito BPER113JUA
Distribuidora EdeNorte - Provincia Monseñor Nouel
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 |
|---|---|---|---|---|
| Clasificación | B | B | B | B |
| Clientes | 1221 | 1221 | 1221 | 1221 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 |
| % Servicio | 98.14% | 98.84% | 96.74% | 99.71% |
| % Sin Servicio | 1.86% | 1.16% | 3.26% | 0.29% |
| Interrupción Programada (Hrs) | 0.00 | 2.00 | 20.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 13.37 | 8.32 | 23.45 | 2.12 |
| Promedio Interrupción Diarias (Hrs) | 0.44 | 0.27 | 0.77 | 0.07 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 07/07/2026 | Ejecutada | 17:49:44 | 17:52:55 | 1.06 | CORRECTIVO EN CONDUCTOR DE FASE |
| 07/07/2026 | Ejecutada | 15:47:54 | 16:35:06 | 1.06 | CORRECTIVO EN CONDUCTOR DE FASE |
| 07/07/2026 | Ejecutada | 15:38:56 | 15:47:54 | 1.06 | CORRECTIVO EN CONDUCTOR DE FASE |
| 07/07/2026 | Ejecutada | 15:34:49 | 15:38:56 | 1.06 | CORRECTIVO EN CONDUCTOR DE FASE |
| 05/07/2026 | Ejecutada | 08:24:51 | 10:13:11 | 1.81 | FALLAS ETED, DISPARO DE LINEA TRANSMISION |
| 03/07/2026 | Ejecutada | 21:11:58 | 21:17:05 | 1.83 | ARBOLES Y RAMA SOBRE LINEA |
| 03/07/2026 | Ejecutada | 18:03:17 | 18:24:43 | 1.83 | ARBOLES Y RAMA SOBRE LINEA |
| 03/07/2026 | Ejecutada | 18:00:10 | 18:03:17 | 1.83 | ARBOLES Y RAMA SOBRE LINEA |
| 03/07/2026 | Ejecutada | 17:05:23 | 17:59:16 | 1.83 | ARBOLES Y RAMA SOBRE LINEA |
| 03/07/2026 | Ejecutada | 16:38:29 | 17:04:37 | 1.83 | ARBOLES Y RAMA SOBRE LINEA |