Circuito BPER112LIB

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 2717 2717 2823 2825 2802 2811 2771 2749 2082 2047 1990 2709
% Nivel Cobranza 0.00% 84.20% 85.41% 105.32% 93.61% 84.60% 114.93% 84.80% 108.26% 74.51% 76.25% 91.86%
% Nivel Pérdida 0.00% 64.09% 57.82% 62.46% 57.61% 59.88% 64.23% 58.31% 70.26% 68.38% 71.43% 59.98%
Energía Suministrada (GWh) 0 1.62 1.41 1.37 1.26 1.37 1.45 1.5 1.65 1.78 1.9 1.78
Energía Facturada (GWh) 0 0.58 0.6 0.52 0.54 0.55 0.52 0.63 0.49 0.56 0.54 0.71
Energía Cobrada (GWh) 0 0.49 0.51 0.54 0.5 0.47 0.6 0.53 0.53 0.42 0.41 0.66
% Servicio 93.67% 92.10% 95.55% 99.71% 97.71% 99.23% 98.69% 98.66% 97.72% 97.98% 96.96% 91.52%
% Sin Servicio 6.33% 7.90% 4.45% 0.29% 2.29% 0.77% 1.31% 1.34% 2.28% 2.02% 3.04% 8.48%
Interrupción Programada (Hrs) 55.00 65.00 35.00 0.00 3.00 0.00 0.00 0.00 0.00 7.00 24.00 38.00
Interrupción Ejecutada (Hrs) 45.55 56.89 32.02 2.12 16.47 5.54 9.74 9.75 16.63 14.76 22.16 61.92
Promedio Interrupción Diarias (Hrs) 1.50 1.87 1.05 0.07 0.54 0.18 0.32 0.32 0.55 0.49 0.73 2.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito BPER112LIB
Interrupciones Programadas 21
Interrupciones Ejecutadas 57.66
% Ejecución Operativa 274.57%
Detalle de Salidas - Circuito BPER112LIB
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Ejecutada 19:10:53 19:21:07 0.24 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
08/07/2026 Ejecutada 17:58:21 18:02:26 0.24 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
07/07/2026 Programada 08:00:00 13:00:00 5
05/07/2026 Ejecutada 08:24:43 10:13:34 1.89 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
05/07/2026 Ejecutada 06:01:05 06:05:42 1.89 DISPARO DESCONOCIDO // FALLAS ETED, DISPARO DE LINEA TRANSMISION
04/07/2026 Programada 07:00:00 12:00:00 5 DISPARO DESCONOCIDO // OTROS
04/07/2026 Ejecutada 15:34:06 15:39:57 4.92 DISPARO DESCONOCIDO // OTROS
04/07/2026 Ejecutada 07:09:27 11:58:39 4.92 DISPARO DESCONOCIDO // OTROS
03/07/2026 Programada 09:00:00 15:00:00 6 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
03/07/2026 Ejecutada 18:01:17 18:14:10 5.78 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
03/07/2026 Ejecutada 17:13:00 17:36:00 5.78 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
03/07/2026 Ejecutada 17:06:39 17:10:55 5.78 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
03/07/2026 Ejecutada 15:11:11 15:16:53 5.78 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
03/07/2026 Ejecutada 09:00:32 14:01:10 5.78 CORRECTIVO EN CONDUCTOR DE FASE // INTERCONEXION DE PROYECTOS // OTROS
02/07/2026 Ejecutada 16:10:48 16:27:36 0.28 DISPARO DESCONOCIDO
01/07/2026 Programada 08:00:00 13:00:00 5 FACILITAR TRABAJOS EMPRESA TRANSMISION // OTROS
01/07/2026 Ejecutada 16:02:52 16:11:15 7.19 FACILITAR TRABAJOS EMPRESA TRANSMISION // OTROS
01/07/2026 Ejecutada 08:03:06 15:05:48 7.19 FACILITAR TRABAJOS EMPRESA TRANSMISION // OTROS
Autopista Duarte hacia La Vega, Los Arroces, Caribe, El Verde, Aguas Negras y Rancho Nuevo.