Circuito BPER112

Distribuidora EdeNorte - Provincia Monseñor Nouel


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación A A A A A A A A B B B A
Clientes 13039 13005 12977 12945 12923 12895 12839 12813 5157 12776 12776 0
% Nivel Cobranza 0.00% 84.05% 97.68% 99.61% 104.68% 107.15% 97.63% 87.51% 93.24% 108.03% 1.12% 98.25%
% Nivel Pérdida 0.00% 22.03% 26.19% 11.58% 28.67% 21.30% 27.24% 14.32% -18.83% -3.15% -34.14% 1.84%
Energía Suministrada (GWh) 0 5.22 4.82 4.21 4.47 4.04 4.36 3.48 2.75 3.01 2.67 3.94
Energía Facturada (GWh) 0 4.07 3.55 3.72 3.19 3.18 3.17 2.98 3.27 3.1 3.58 3.87
Energía Cobrada (GWh) 0 3.42 3.47 3.7 3.34 3.4 3.1 2.61 3.05 3.35 0.04 3.8
% Servicio 99.13% 98.38% 96.23% 96.51% 97.98% 99.36% 99.56% 99.59% 99.55% 99.62% 96.23% 0.00%
% Sin Servicio 0.87% 1.62% 3.77% 3.49% 2.02% 0.64% 0.44% 0.41% 0.45% 0.38% 3.77% 0.00%
Interrupción Programada (Hrs) 7.00 10.00 26.00 20.00 5.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 6.33 11.85 27.49 25.51 14.74 4.67 3.23 2.96 3.31 2.79 27.51 0.00
Promedio Interrupción Diarias (Hrs) 0.21 0.39 0.90 0.84 0.48 0.15 0.11 0.10 0.11 0.09 0.90 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Calle Duarte, Calle Pedro Santana, Calle Gral. Cabral, Calle La Altagracia (Desde La calle Padre Fantino hasta la calle España), Calle Los Santos (desde calle Padre Fantino hasta la calle Duarte Vieja), Calle Independencia (Desde calle Padre Fantino hasta calle El Sol), El Mercado Público, Autopista Duarte hacia Santo Domingo, Los Transformadores, El Mango de Pepe, Caño Grande, Los Olimpicos parcial, Calle Central, Calle Jaragua Parcial, Avenida Privada, Autopista Duarte Hacia la Vega Parcial.